YourOnlineQuantitySurveyor. (@AwolowoSenator) header
YourOnlineQuantitySurveyor. (@AwolowoSenator) profile picture

Quantity Surveying// Construction Management// Construction Law// Real Estate// Politics// PMNIQS, MCLF.

Akure, Nigeria
Joined July 2020
I went back to write the exams in pain. God did! I'm getting much better now and I'm hoping for full recovery. Sickle cell might have won the battle, but I've won the war. Reintroducing myself: Audu Joshua Oluwaseun (PMNIQS) B. Tech Quantity Surveying, FUTA (Hons) 4.43/5.00
Not to make you feel better, but I've been on the sick bed since April 20 treating sickle cell complications. Meanwhile I was suppose to be wrapping up my last semester in the university and graduate with a first-class degree.. But all is well!
12
10
2
73
10,735
That was my PRO !!! Congratulations last man standing tall!!!❤️🫂
This quoted post is unavailable.
1
2
195
Most of our site engineers actually preferred staying on-site rather than coming into the office. Mistakenly step into the office, na there HR go tell you say you’re not properly dressed, your shoes are wrong, you’re late, etc.
construction company man. nothing concern them with appearance, just do your job that's all.
1
2
270
“Say NO once, and they might not call next time when you actually need it.” Last year, while battling my health in the hospital, a lucrative gig came in. I couldn't risk turning it down, so I accepted, subcontracted it to a colleague, and did the final checks from my sickbed.
Anytime I tell myself I’ve tried enough for the week and I’ll use the weekend to rest, this man will call and say, “QS, I have work ooo.” And I can’t even say no because that’s my hustle. Say NO once, and they might not call next time when you actually need it.
1
3
195
We mount next year by God’s grace!!!
Missed today's convocation because a gig took me outside school. But I'm not missing next year's because I'll be among those being celebrated. Next year, it's my turn! 🎓
1
1
2
124
This got me…😂😂 “To tender oh🧏🏾! I will not go and pay labourers 13k per day”
SERIES. BUILD-UP RATES. Unskilled Labour per hour. Full video on YouTube. Link below 👇🏻
1
4
5
496
YourOnlineQuantitySurveyor. retweeted
Kindly subscribe to my YouTube channel. 👇🏻 SERIES: BUILD-UP RATES-Unskilled Labour Per Hour youtu.be/Tcv0mQgU7q8
12
1
25
895
YourOnlineQuantitySurveyor. retweeted
Measurement Hack 101: Working with drawings that lack sufficient design information can make you assume that incomplete details are the norm. Don't let repeated exposure to inadequate drawing information make you overlook essential details. Always scrutinise drawings thoroughly before making reasonable assumptions where necessary information is genuinely missing.
3
8
20
479
YourOnlineQuantitySurveyor. retweeted
If not for quantity surveying, what would I have become? 😂 To think I knew absolutely nothing about the course when I selected it on my PCE form that year! 😀
6
2
1
31
1,147
YourOnlineQuantitySurveyor. retweeted
My name is Habeeb. And I’m a ConstructionPM.
12
2
39
947
YourOnlineQuantitySurveyor. retweeted
WHY ROOF AREA IS NOT THE SAME AS FLOOR AREA Your building has a floor area of 150m². Does that mean you need 150m² of roofing sheets? Not necessarily. Roofing measurement is based on the actual sloping roof surface, not simply the horizontal floor area. Before estimating roofing materials, consider: 🔹Roof pitch (slope). 🔹Number of roof sections. 🔹Length of overhangs. 🔹Hip, valley and ridge details. 🔹Roofing sheet profile and effective coverage width. 🔹Cutting and laps. A building with a simple roof design may require less roofing material than another building with the same floor area but a more complicated roof structure. Never estimate roofing sheets from floor area alone. Save this before your next roofing estimate.
2
8
10
179
YourOnlineQuantitySurveyor. retweeted
Replying to @AwolowoSenator
Column bases with its ancillaries will humble you. Alot of hidden materials, labour and uncertainty will definitely happen with more columns. What about concrete and it's ancillaries?
1
1
2
32
YourOnlineQuantitySurveyor. retweeted
10 THINGS WORKING WITH LABOURERS ON A CONSTRUCTION SITE HAS TAUGHT ME. SOME LESSONS WERE EXPENSIVE. 1) Never pay labourers their full money before the agreed work is completed. 2) Never assume work will be done properly just because they claim they know how to do it. 3) Set deadlines and hold them accountable. Don’t always wait for excuses. 4) Be kind, but never let kindness make you lose control of your site. 5) Don’t believe every story you hear. Verify things yourself. 6) Don’t let pity make you overlook poor performance. 7) Don’t casually lend out your tools and equipment. Keep records or rent them out with clear terms. 8) Don’t disclose your entire budget or financial position on site. 9) Sometimes, buying food for your workers goes a long way. Treat people well. 10) Supervise their work closely. Don’t assume everything is going according to plan. A construction site requires more than money and materials. It requires wisdom, patience, discipline and firm management.
7
32
112
3,793
YourOnlineQuantitySurveyor. retweeted
It was an honour walking you through the process of creating PlanSwift plugins, my leader.
The plugins I had were having some errors, which I’d been wanting to fix, until I stumbled upon this tweet. I linked up with my guy, @Emmymouthpiece, over the weekend, and he put me through. Ladies and gentlemen, I’m in the kitchen now! All thanks to him. 😤👷🏾‍♂️
1
1
7
116
This new role is kind of interesting, though. No more staying late on-site. I go to site at my own pace, whenever it’s convenient. My phone is no longer buzzing with calls from suppliers and engineers. No more chasing deadlines with sanctions attached. 😤
My company says, “Enough of you being a Quantity Surveyor. We need you as an Assistant Project Auditor for construction projects!” Well, let’s see how this goes. 😌😩
2
7
280
YourOnlineQuantitySurveyor. retweeted
Replying to @AwolowoSenator
That's what people don't understand, a lot of unseen items affects the cost of a project
1
1
1
57
The plugins I had were having some errors, which I’d been wanting to fix, until I stumbled upon this tweet. I linked up with my guy, @Emmymouthpiece, over the weekend, and he put me through. Ladies and gentlemen, I’m in the kitchen now! All thanks to him. 😤👷🏾‍♂️
The engine room for template customization. Roof measurement template,is gradually going.
1
1
1
8
419
Building A: 210m², with 21 columns, Building B: 160m², with 32 columns designed You’d expect Building B to cost less because of its smaller size, but that’s not always the case. Construction costs depend on several factors, with the size of the building being just one of them👷🏾‍♂️
3
2
7
498
YourOnlineQuantitySurveyor. retweeted
Not all science students have to study medicine, some of us have to hold it down in Quantity Surveying.
1
8
1
29
466
YourOnlineQuantitySurveyor. retweeted
It's time to start looking for a final-year project topic. If you have any tips on how to choose a project topic within your area of interest, kindly share them. I'd really appreciate your suggestions. Thank you. @WithBukky
4
6
2
18
1,264
Mondays are always less productive. One meeting after another, setting targets and goals for the week. 😞 Cheers to a new week!🥂
1
7
197