Dratu retweeted
Compute has an expiration problem
An unused GPU-hour can't be stored for tomorrow.
Once that hour passes, the capacity is gone
But access to compute can be standardized, priced,
and traded before it's consumed.
That's what we're building at RAX Finance
Making compute fungible and tradable.
🤖 Made with AI
Dratu retweeted
A GPU doesn't generate revenue just because it's
powerful
It generates revenue when someone needs its
compute.
That distinction matters a lot more than people think.
🤖 Made with AI
Dratu retweeted
Compute is not a commodity yet.
Why? No standard unit.
Every GPU purchase is different:
• Region differs
• Provider differs
• Price differs — $1.99 to $5.99 for the same H100
• Contracts are locked and hard to resell
@RaxFinance is building a standard:
1 cT = 1 GPU-hour
Backed 1:1 by real machines.
Trade it or redeem it for compute.
Same unit, anywhere in the pool.
Making compute fungible and tradable.
🔗 Join the Waitlist:
app.rax.finance/waitlist
💬 Drop your address below.
🎁 Surprise Unboxing Opportunities await.
Dratu retweeted
You can buy a barrel of oil without knowing which well
it came from.
But renting GPU compute still means choosing a
provider, region, hardware configuration, and contract.
That's the difference between buying a commodity
and negotiating a service.
AI compute is ready for a better market structure.
And that's exactly what RAX Finance is building.
rax.finance
🤖 Made with AI
Dratu retweeted
More GPUs don't always mean more compute.
Utilization matters.
A data center running 10,000 GPUs at 30% utilization has very different economics from one running the same fleet at 80%.
As AI workloads evolve, the value of compute will increasingly depend on:
• GPU utilization
• Workload demand
• Energy costs
• Hardware efficiency
Compute capacity tells us what exists.
Utilization tells us how much of it is actually being put to work.
Dratu retweeted
There's a difference between having a price and having a market.
GPU providers already publish prices. But those quotes vary by region, hardware, contract length, and availability.
A functioning commodity market needs something more: standardized units, reliable delivery, and prices participants can actually trade against.
That's where compute markets get interesting.
🤖 Made with AI
Dratu retweeted
A 1GW AI factory is being described as a $50B -a-year rental machine.
Jensen’s CNBC numbers make the unit economics clearer:
• ~$50–60B to build
• ~$50B in annual rental revenue
• capital that can pay itself back on a very short cycle if utilization holds
That is why this is no longer just a GPU cycle.
It is power + chips + cooling + financing, packaged as a factory that sells compute by the year.
When the world’s largest compute company starts quoting AI factories in gigawatts and rental revenue, the asset is the factory itself.
Compute is becoming the scarce, cash-flowing layer underneath the entire AI buildout.
youtu.be/0Kv6jhEhHRo?si=XlH1…
Dratu retweeted
What is an hour of AI compute actually worth?
Not all compute is priced the same.
The value of AI compute changes based on:
• GPU model
• Location
• Availability
• Demand
As AI infrastructure scales, transparent price discovery becomes essential.
That’s the market infrastructure RAX is building.
Dratu retweeted
Hot take time:
AI compute should be priced like:
A) Oil — global commodity, single benchmark (WTI/Brent model)
B) Electricity — regional grid, locational pricing (LMP model)
Reply with A or B + your reasoning.
We're clearly Team B (hence building regional indices), but curious what you think.
Especially want to hear from folks who disagree 👀
Dratu retweeted
643 AI data center campuses. Across 55 countries.
That's the infrastructure footprint captured in one
recent industry census.
And every new location brings its own energy costs,
capacity constraints, and compute economics.
AI may be global, but the cost of powering it isn't
universal.
🤖 Made with AI
Dratu retweeted
AI companies have a compute problem:
Sign a 12-month GPU contract.
Need it for only 3 months.
→ $30K/month still gets burned.
40% of your reserved capacity sits idle.
You’re locked into the contract.
→ Capital stays tied up.
@RaxFinance is building a marketplace for tradable compute capacity.
Have 9 months of H100 capacity left?
Monetize the unused portion.
Need compute for a shorter period?
Access available capacity without committing to a long-term contract.
Compute capacity shouldn’t have to sit idle.
Coming Soon 👉 rax.finance/
Dratu retweeted
Friday check-in 👋
What’s caught your attention in AI compute this week?
A new GPU, a data centre trend, or the future of ComputeFi?
We’re curious what the Rax community is following. Drop your thoughts below 👀
Dratu retweeted
Compute is being planned on a multi-year horizon.
Chipmakers are already securing EUV tools for 2029 and 2030.
ASML says customers are asking for more machines every day, even as 2027–2028 capacity expands.
The industry is locking in the manufacturing base for the next wave of AI capacity years in advance.
Via @wallstengine
$ASML SAYS CHIPMAKERS ARE ALREADY LOOKING TO PLACE EQUIPMENT ORDERS FOR 2029 AND EVEN 2030
CEO Christophe Fouquet says “customers are asking us every single day to get more tools,” as AI-related investments drive stronger demand for advanced semiconductor equipment.
The company also outlined major milestones for its next-generation High-NA EUV technology, which Fouquet says is finally approaching high-volume manufacturing after more than a decade of development.
Samsung plans to begin using High-NA EUV in mass production in 2028, followed by TSMC around 2030. Intel is already increasing the number of layers processed and wafer output using the technology.
Separately, ASML plans to introduce its NXE:3800F EUV system in 2027, increasing throughput from 230 to 260 wafers per hour, with a greater impact on customer manufacturing capacity expected from 2028 onward.
Dratu retweeted
📊 Open question for the compute market:
By the end of 2027, what % of APAC third-party GPU capacity will be traded on secondary markets rather than remain locked in long-term contracts?
We’re talking about neoclouds and independent operators, excluding hyperscaler self-use. Secondary trading includes unused or residual contracted capacity changing hands.
Our working hypothesis: 15–25%.
Why?
• Multi-year take-or-pay contracts still dominate, with limited early-exit options.
• Secondary trading is emerging, but liquidity, standardisation, and counterparty trust are still developing.
• As market infrastructure matures, more unused capacity could find a second buyer.
What’s your prediction, and why? 👀
Let’s revisit this in 12 months and see who got closest.
Dratu retweeted
Scenario:
You sign a 12-month GPU contract for $2.5/hr.
3 months in:
• Your project pivots and needs a different region
• Your original contract still has 9 months left
• You're locked in, paying $216K for ~13 GPUs you can't use
What would you want?
A) Transfer the contract to someone else
B) Redeem it for other compute (different region/model)
C) Eat the cost — that's business
D) Something else? Tell us below.
💬 Reply with your choice + RAX Finance Waitlist address.
🎁 We’ll reward great answers with 5 Unboxing Opportunities!
🔗 app.rax.finance/waitlist/
Dratu retweeted
AI companies have a compute problem:
Sign a 12-month GPU contract.
Need it for only 3 months.
→ $30K/month still gets burned.
40% of your reserved capacity sits idle.
You’re locked into the contract.
→ Capital stays tied up.
@RaxFinance is building a marketplace for tradable compute capacity.
Have 9 months of H100 capacity left?
Monetize the unused portion.
Need compute for a shorter period?
Access available capacity without committing to a long-term contract.
Compute capacity shouldn’t have to sit idle.
Dratu retweeted
Why regional compute pricing matters: the financing gap no one is talking about
AI infrastructure spend is exploding — but ownership structures differ sharply by region, and that gap is showing up in financing costs.
Dratu retweeted
Exactly.
The bottleneck is connecting power, construction, equipment, and cloud capacity on one timeline.
The suppliers and operators determine whether a site gets built quickly or stays stuck in the queue.
Compute capacity creates most of its value only after it’s online and serving demand.
Yotta brought the AI infrastructure ecosystem under one roof, giving IREN leaders three days of direct conversations with the suppliers, builders and operators shaping what comes next.
- IREN is strengthening ties with leading construction and equipment partners
- Suppliers want to partner with developers that can execute
- Vertical integration from grid to AI Cloud is how IREN delivers with speed and reliability
Watch the highlights.
Dratu retweeted
The compute market is at the stage where:
• Electricity was in the 1990s (before deregulation)
• Oil was in the 1950s (before posted prices → spot markets)
• Carbon credits are today (trading exists, but fragmented)
We're watching commodity infrastructure form in real-time.
What we're building: docs.rax.finance/






















