Photo by DSC (@Direct_Sewer)Photo by DSC (@Direct_Sewer)Photo by DSC (@Direct_Sewer)Photo by DSC (@Direct_Sewer)Photo by DSC (@Direct_Sewer)Photo by DSC (@Direct_Sewer)Photo by DSC (@Direct_Sewer)Photo by DSC (@Direct_Sewer)Photo by DSC (@Direct_Sewer)Photo by DSC (@Direct_Sewer)
Private Client in Lincolnshire - For the development of 4 No. new build residential homes - Excavate down 2.6m and break and connect into existing manhole - Installation of 19m of 150mmØ sewer pipe from the new connection. - Reinstatement to the excavation area
Seeking Groundworks Gangs (2 or 3 men) for sites in Coventry, Peterborough and Nottinghamshire. Must have CSCS/CPCS/NPORS (minimum) and be experienced in Housing, and Industrial/Commercial sites. Call 0330 133 1475 or email [email protected]
Middlebeck School in Newark, Nottinghamshire. Steel framework progressing.
Works now complete at Carlton Cemetery, for @LindumGroup and @GedlingBC, to construct a new Memorial Garden. ⁣ The diggers are all gone, and nature very quickly reclaims what is rightfully hers 🌿🌳
1
2
When you get that phone call “Boss, we’ve come across some services in the footpath........”⁣
Ongoing deep #drainageworks at Middlebeck School in Newark for Lindum
Section 38 Roads & Sewer works now complete, awaiting blacktop surfacing.⁣ These are enabling works for our new housing development for our client, Wheatley Homes at Harvester Way, Peterborough.⁣
Harvester Way, Crowland, Peterborough. Works progressing on the 600mm diameter storm sewers.⁣⁣
Middlebeck School in Newark, Nottinghamshire. Commencement of deep drainage works. Working with @LindumGroupLtd and Urban & Civic.
Replying to @Direct_Sewer
Great working with you.
1
1
Complete Substructures and Groundworks package to facilitate the construction of a brand new school serving a new edge-of-town residential development for Lindum Construction at (New) Middlebeck School, Newark-on-Trent.⁣⁣ Contract Value: £1m +.⁣⁣
1
160 cubic metre pump-pour in progress at Lindum, Waddington. Drainage and floor construction complete.⁣ ⁣⁣⁣⁣⁣
Ongoing Construction Project ⁣ Client: Private development ⁣ ⁣ Location: Whatton , Nottinghamshire ⁣ ⁣ Contract Value: £ 1.1 million ⁣ ⁣ Contract Works: construction of 3 houses to high specification.⁣ ⁣
Ongoing Contract! ⁣ Client: Lindum homes⁣ Location: Ravenstone Leicester ⁣ Works updates: 5 meters depth foul connection with new MH.⁣ Ongoing works to foundations and plot drainage.⁣
New Contract! ⁣⁣ Client: @BTLProperty ⁣ Location: Loughton , London ⁣ Contract Works: Installation of foul sewer connection with saddle, 3.5 meters depth and 11 meters foul sewer pipe laid to clients demarcation manhole.⁣
1
1
1
New Contract Client: Post Office Location: Nottingham Works: Drainage and new site entrance. Contact us for a quote directsewers.co.uk/ | [email protected]⁣⁣
New Contract Client : Seddon Construction Contract Value : £650 K Location: Coventry Works : full Groundwork’s package labour plant and materials. Works include Foundations , drainage , external works and 278 works. Contact us for a quote [email protected]⁣⁣
Bricklayers required for new housing site commenced in Coventry. Approximately 5 weeks work. CSCS required Good rates paid Email [email protected] if interested.
Client : Nelson Wharf ⁣⁣ Location : Stratford-Upon-Avon ⁣⁣ Works : Foul Sewer Connection ⁣⁣ for Barge boats , saddled connection onto 375 mm sewer pipe and installation of 9 meters of 150 mm Dia pipe to new demarcation manhole⁣⁣ ⁣⁣ Contact us for a quote
1
Client: SDC⁣⁣ Location : Oxford⁣⁣ Works : Foul Sewer Connection ⁣⁣ Connection 2.5 m Depth with Y junction , Installation of 68 Meters of 150 mm Dia pipe and construction of new manhole 1.2 meters depth.⁣⁣