Photo by EnergyStorageGuy (@MrEnergyStorage)Photo by EnergyStorageGuy (@MrEnergyStorage)Photo by EnergyStorageGuy (@MrEnergyStorage)Photo by EnergyStorageGuy (@MrEnergyStorage)Photo by EnergyStorageGuy (@MrEnergyStorage)Photo by EnergyStorageGuy (@MrEnergyStorage)Photo by EnergyStorageGuy (@MrEnergyStorage)Photo by EnergyStorageGuy (@MrEnergyStorage)Photo by EnergyStorageGuy (@MrEnergyStorage)Photo by EnergyStorageGuy (@MrEnergyStorage)
EnergyStorageGuy retweeted
Tesla has officially unveiled its first-ever transformer called Powercore, enabling fully off-grid data centers. • Solid state medium voltage transformer, inverter & breaker • Peak efficiency: 98.86% • Power: 9 MVA 7.4 MW. Grid-forming support for 10MVA of peak power. • AC Voltage: 10 kV - 35 kV • DC Voltage: 800 Vdc - 2000 Vdc • 25-year warranty • Make Tesla Megablock even better • Powers 800 Vdc data centers • Accelerates 1500 to 2000 Vdc solar • Made in America • Operating 2027
Introducing Powercore Solid state medium voltage transformer, inverter and breaker – reliable, safe and secure 7.4 MW/9 MVA continuously at 34.5 kVac w/ grid-forming support for 10MVA of peak power Made in America. Operating 2027
268
1,043
82
10,746
691,034
EnergyStorageGuy retweeted
Some phone videos I took from the tower
14,263
30,447
2,536
302,085
9,123,654
A built in 🔋is a nice addition
SpaceX has just officially unveiled its next-generation @Starlink Mini 2, which now comes with a built-in battery for the first time. • Up to 4.5 hours of connectivity on a single charge with the quick-swap battery (or plug in USB-C). • Weight: 3.53 Ibs (1.6 kg) including battery and kickstand • Dimensions: 10.35 × 12.36 × 0.91 inches (263 × 314 × 23.1 mm) • Field of view: 55° • Wi-Fi: Wi-Fi 6 • Environmental rating: IP67 • Wi-Fi coverage: Up to 1,800 sq ft (167 m2) • Battery: Removable, rechargeable 71 Wh battery • Battery weight: 1.08 Ibs (490g) • Battery attachment: Quick-release mechanism • Charging: USB-C, 60W • Battery power output: USB-C, up to 60W • Power button: Built-in physical power button • Battery indicators: LED status lights • Kickstand: Integrated, foldable kickstand • Tripod mount: Standard 1/4"-20 camera thread • Charger: Included 60W USB-C wall charger • Cable: Included 3-meter (10-foot) USB-C to USB-C cable Starlink is now taking preorders in the U.S.: starlink.com/mini-2
62
Quick point on batteries and generators that comes up often in our meetings and project discussions: a battery isn't necessarily a generator replacement. It's one piece of the energy equation. 🧵
1
51
Most outages are short. 40% of C&I companies say their typical outage lasts under 5 minutes. A battery covers those instantly, with no start-up gap.
1
25
But longer duration outages do happen, like hurricanes and major storms. For hospitals, water systems, emergency operations, and manufacturing that can't stop, generators are still essential. The battery does most of the heavy lifting. The generator is there when it's needed.
15
Portugal now requires grid-forming capability and synthetic inertia for new battery deployments that are 45 MW+ or connected to the transmission grid. The rule took effect Oct 23.
1
46
Why? More than 1 GW of storage is in their pipeline, and 🔋s can switch quickly between charging and discharging. Regulators want them actively stabilizing frequency and voltage.
1
23
Portugal had just 20 MW of batteries operating at the end of 2025 and is targeting 6.9 GW by 2030. Even 500 kW+ systems must have the ability to support frequency regulation when needed.
14
We often find the inverter/PCS is more challenging to get right than the DC battery side of a BESS. It can get complicated, but these are the key specs we look at when evaluating one. 🧵⚡️
1
5
157
Certifications. In the US, look for UL 1741 SB and IEEE 1547-2018. Without them, interconnection gets slow or doesn't happen at all. Check the AHJ and utility's specific requirements, some require specific pre-approval / listing.
1
43
The rest usually can't be found on the spec sheet, so it's important to engage with the manufacturer early on. Controls, mode of operation, and other limitations are critical to understand as early as possible.
1