Love my homeland.. A concerned citizen who wants to see Pakistan as a moderate, tolerant & pluralistic Republic. Retweets may/maynot b endorsements

Lyallpur (Fsd), Pakistan
Joined February 2011
Musadaq Zulqarnain retweeted
Interloop has received the Game Changer Icon Award from the @efp_pak, presented by @ilo Director-General @GilbertFHoungbo. Recognising our contribution to Pakistan’s economic and social development through responsible manufacturing and employment. #ResponsibleBusiness
🤖 Made with AI
3
13
581
Musadaq Zulqarnain retweeted
Pakistan needs more entrepreneurs who invest, innovate and create value! Kudos to @MusadaqZ, one of Pakistan’s most admired entrepreneurs, for another bold $55 million investment driving industrial growth, import substitution and exports.
Pleased to announce that, by the grace of God Almighty, @ILHoldings (Interloop Holdings), in partnership with Rella Gida of Türkiye, is embarking on the construction of a new dairy processing plant under IL Foods Limited, with an investment of US$ 55 million (PKR 15 billion). The state-of-the-art facility will produce a range of cheeses and butter, as well as Whey Protein Concentrate (WPC80), a high-value protein product. We also aim to export part of the production, contributing to Pakistan’s value-added exports. With the commissioning of this new facility, our combined annual milk processing capacity will reach 180 million litres. This investment reflects our continued commitment to value addition, technological advancement, import substitution, and the development of Pakistan’s dairy industry. @rellagidatr @TC_IslamabadBE @sifcpakistan @fiedmc_official
6
32
198
5,824
Musadaq Zulqarnain retweeted
Pleased to announce that, by the grace of God Almighty, @ILHoldings (Interloop Holdings), in partnership with Rella Gida of Türkiye, is embarking on the construction of a new dairy processing plant under IL Foods Limited, with an investment of US$ 55 million (PKR 15 billion). The state-of-the-art facility will produce a range of cheeses and butter, as well as Whey Protein Concentrate (WPC80), a high-value protein product. We also aim to export part of the production, contributing to Pakistan’s value-added exports. With the commissioning of this new facility, our combined annual milk processing capacity will reach 180 million litres. This investment reflects our continued commitment to value addition, technological advancement, import substitution, and the development of Pakistan’s dairy industry. @rellagidatr @TC_IslamabadBE @sifcpakistan @fiedmc_official
101
141
22
915
45,116
Musadaq Zulqarnain retweeted
70% of the raw materials we use come from sustainable sources. That means more responsibly sourced cotton, recycled fibres and certified materials going into what we make. #SustainableMaterials #Interloop
2
6
401
Musadaq Zulqarnain retweeted
NUMBER OF PAKISTANI WORKERS REGISTERED FOR EMPLOYMENT ABROAD DURING THE PERIOD 2024-2026 (Till September). Total was 1.919 million. 80% were classified as labourers and drivers. Economic reasons for emigration is a separate topic but the following is just to provide correct information as most other media reports appear to be incorrect.
یہ برین ڈرین بھی ہے،امید ڈرین بھی ہے اور مستقبل ڈرین بھی ہے ،خدارا اشرافیہ/اسٹیبلشمنٹ اس ملک پر رحم کرے۔یہ ذہانت کا انخلاء ہے،یہ ملک کےمستقبل پر اعتماد کا خاتمہ ہے۔ ترسیلات زر کی گردان کرنے والو: ریمیٹنسز اس کا ازالہ نہیں ہے متبادل نہیں ہے۔۔ یہ ہے اس کرپٹ غلام اشرافیہ کی پالیسیاں۔۔۔3 سال میں 18 لاکھ 71 ہزار باصلاحیت،ہنر مند افراد ڈاکٹرز،انجینئرز،آئی ٹی پروفیشنلز اور دیگر شعبوں کے ماہرین(حقیقی تعداد اس سے کہیں زیادہ ہوسکتی ہے) بیرون ملک چلے گئے۔۔ اس کرپٹ اشرافیہ نے پاکستان زندہ باد کے بجائےپاکستان سے زندہ بھاگ کی روش دی۔
9
24
1
73
5,608
Musadaq Zulqarnain retweeted
This #WorldCottonDay, we’re looking at cotton from the farm onwards. Interloop’s Regen and Organic Kapas focus on how it is grown, while Looptrace links 43,000 farmers to the supply chain for greater visibility from the source. #InterloopKapas #Traceability
4
8
402
Musadaq Zulqarnain retweeted
“A country does not become capital-rich by accumulating valuable land. Instead, it becomes capital-rich when yesterday’s savings can keep financing tomorrow’s assets, and continue generating more output and income. This is effectively the difference between saving in plots and building an economy.” An interesting piece by Ammar Khan @rogueonomist WHY PAKISTAN SAVES IN PLOTS dawn.com/news/2033860
1
18
44
2,513
Musadaq Zulqarnain retweeted
Replying to @rehanjawed
What is the economic logic of selling PKR 1683 per MMBtu Gas for PKR 5000+ to the Industrial sector. @MusadaqZ @mukhtarkhurram
2
7
1
15
1,652
Musadaq Zulqarnain retweeted
We have won the Sustainability Award - Four Pillar Excellence from @GCNP_Pakistan. Recognising how Human Rights, Labour, Environment and Anti-Corruption are put into practice across our operations. @globalcompact
1
3
5
373
Congratulations to Interloop Limited on winning 1𝐬𝐭 𝐏𝐥𝐚𝐜𝐞 in the Large Category of the Sustainability Award: Four Pillars Excellence at the 𝐆𝐂𝐍𝐏 𝐒𝐮𝐬𝐭𝐚𝐢𝐧𝐚𝐛𝐢𝐥𝐢𝐭𝐲 𝐀𝐰𝐚𝐫𝐝𝐬 2026! 🏆
1
4
132
Musadaq Zulqarnain retweeted
Pakistan’s Brilliant Record in Hockey before we gave up on Hockey World Cup Winner — 4 times Pakistan remains the most successful nation in men’s World Cup history, with four titles: 1971, 1978, 1982, 1994 & runner-up in 1975 & 1990 Olympic Games — 8 medals Gold 3 Silver 3 Bronze 2 Asian Games — 14 medals including 8 Gold Asia Cup — 3 titles & 3 runners up
1
6
23
1,592
Musadaq Zulqarnain retweeted
More than 1,000 girls have taken part in sport through @InterloopLtd partnership with the @KAFPakistan. We’re extending that partnership so more girls can play, compete and keep playing. #ShePlaysSheWins #GirlsInSport
More than 1,000 girls have taken part in sport through our partnership with the @KAFPakistan. We’re extending that partnership so more girls can play, compete and keep playing. #ShePlaysSheWins #GirlsInSport
2
2
15
1,040
Musadaq Zulqarnain retweeted
More than 1,000 girls have taken part in sport through our partnership with the @KAFPakistan. We’re extending that partnership so more girls can play, compete and keep playing. #ShePlaysSheWins #GirlsInSport
2
1
1
959
Musadaq Zulqarnain retweeted
Honourable and Respected Prime Minister Muhammad Shehbaz Sharif Sahib, @PakPMO, 1. With utmost respect, there should be one industrial gas sale price, the section 8 price set at OGRA’s prescribed price, to protect exports, investment and employment. 2. SNGPL’s FY2025-26 FRR petition puts its average prescribed price at Rs 1,683/MMBtu (about US$6), before OGRA’s scrutiny. That already includes about Rs 120.5 billion of RLNG diverted mainly to winter household demand, about 16 cargoes. 3. Yet the effective captive price was Rs 5,523/MMBtu in May and Rs 5,247/MMBtu in June, 3.3 and 3.1 times that prescribed price. (Slides attached as a ready reference.) 4. The levy is punitive by design. Under section 4 of the Off the Grid (Captive Power Plants) Levy Act, 2025, it is benchmarked to the NEPRA B3 industrial tariff, and the statutory margin rises from 5% to 10%, then 15%, and now 20%. 5. That electricity B3 tariff comes from a grid in a utility death spiral. Solar has cut daytime sales, so fixed costs fall on fewer units - tariff keeps rising. It is already loaded with high fixed costs, losses and cross-subsidies, and is regionally uncompetitive before the margin is applied. 6. The Captive levy fails on its own arithmetics. Corrected inputs to Levy Act’s formula produce no positive differential from February 2025 to February 2026 i.e. the levy should be zero. The notified rate is an artificial recovery. (See attached Infographics) 7. The grid’s reliability indices are high: SAIFI, frequency of failure, and SAIDI, the duration, are both high. Even when supply is available, industry is exposed to voltage dips, swells and harmonics. 8. Sir, process and captive take gas from the same network and cost the same to serve. Two industrial gas tariff cannot be justified. 9. Industry’s captive gas engine, in single cycle, follows the load and picks up the evening ramp in minutes, so a large, expensive BESS is not required. Gas is the transition fuel that lets industry integrate renewables and meet climate tests such as CBAM. 10. In cogeneration, up to 70-80% energy utilization, and line losses are negligible. Grid electricity carries 20–25% AT&C losses and still needs a separate boiler. For details, please see the note of 6 September 2026: xitter.cf/AsimRiaz1978/status/20… 11. The captive levy is not set by OGRA’s cost of service, or by gas-market fundamentals for TPA gas. It is set off the power-sector tariff, and the statutory margin is now 20%. 12. Raising the gas price starts a volume-price spiral on the gas network, as we witness in the FRRs of both SNGPL and SSGC. Lost sales push the gas price up, and the higher price drives away more sales. Significant captive load did not move to the grid. It shut down or moved away from both the gas and power grid. 13. The load that did move to the grid was forced across by a punitive industrial gas tariff. It was not new demand. A policy meant to shift demand from gas to the electric grid has extinguished demand rather than shifted it. Prayers: Two decisions are respectfully sought. 1. One industrial sale price under section 8 of the OGRA Ordinance, 2002, for process and captive use alike, at about Rs 1,700/MMBtu. Sir, this is OGRA’s prescribed price. It already includes the RLNG diversion. It is not a subsidy to industry. 2. Withdrawal of the levy under section 3 of the Off the Grid (Captive Power Plants) Levy Act, 2025. It is not a cost of gas. Under section 5, the proceeds go to reducing power tariffs, so the levy places a power-sector cost on industrial gas. Industry should pay for the energy it consumes, not for the inefficiencies of the Gas and Power Sector. Respectfully submitted for your kind consideration. A time-bound decision is sought. @AliPervaiz450 @Financegovpk @betterpakistan @sifcpakistan @jam_kamal @Gohar_Ejaz1 @BilalAKayani @Rashidlangrial @81ShahbazRana @SkmMustafa @KhaleeqKiani @MusadaqZ @shahzadsaleem @mukhtarkhurram @nadeemhaque @AliKhizar @Asad_Ashah
Honourable Prime Minister of Pakistan @PakPMO, Pakistan’s rapid energy transition has moved ahead of its policy framework. Industrial baseload in (especially in Gas Sector) is being forced to carry the cost of seasonal cooling and heating peaks. That is not reform; it is economic amputation. It is like sacrificing a healthy limb to reduce body fat. Sir, the real fat lies in underutilized capacity payments, planning and governance failures, the Sui return-on-asset business model, cross-subsidies, bureaucratic inefficiencies, high UFG, RLNG diversion and actualisation distortions, circular debt, weak cost causation and distorted price signals. Reform should remove these structural inefficiencies, not transfer their cost to productive industry. Solar has become Pakistan’s single largest source of electricity, contributing around 35% of total generation. Cumulative solar PV module imports have reached nearly 60 GW, of which an estimated 50 GW is installed, generating around 54 TWh annually. @jackprandelli, the original map required correction, which I have updated. Solarisation has reduced daytime grid demand, but it has not removed fixed capacity costs or the evening peak. With nearly 73% of power-system costs fixed, these costs are now being recovered from fewer grid units, increasing the burden on remaining consumers. The deeper issue is cost causation. LNG cargoes imported to meet evening and midnight residential cooling load should not be socialised into industrial tariffs without dispatch data, cargo-wise reconciliation and sector-wise cost-causation review. Under Pakistan’s pooled power-generation system, the cost of hydropower, nuclear, coal, indigenous gas, RLNG and other sources is blended into the Energy Purchase Price and fuel-cost adjustments. This hides who created the cost and who ultimately pays for it. Industry then carries a double burden. On the gas side, industrial captive consumers face high captive-gas tariffs with over PKR 1,800/MMBtu embedded cross-subsidy, blended recovery of indigenous gas and RLNG costs, and the punitive Off-Grid Captive Levy. The effective delivered gas price can change with the allocation mix between indigenous gas and RLNG, weakening tariff transparency and OGRA tariff finality. On the power side, if industry is pushed onto the grid, it also pays capacity charges and pooled imported-fuel costs, including RLNG used for evening and late-night cooling demand that industry did not create. In effect, productive industry is being made to absorb stranded costs in both the gas and power sectors. Pakistan needs competitive gas markets, removal of cross-subsidies from industrial gas tariffs, and a grid that wins industrial demand through affordability and reliability, not coercion. @akleghari @AliPervaiz450 @Financegovpk @MIshaqDar50 @betterpakistan @sifcpakistan @jam_kamal @Gohar_Ejaz1 @BilalAKayani @Rashidlangrial @81ShahbazRana @SkmMustafa @KhaleeqKiani @APTMAofficial @AptmaUncut @FPCCIOfficial @MusadaqZ @shahzadsaleem @mukhtarkhurram @nadeemhaque @AliKhizar @Asad_Ashah @nadeemhaque @rehanjawed
13
2
18
10,866
Musadaq Zulqarnain retweeted
3.5 MW of new solar takes Interloop’s total capacity to 21 MW. Over the past year, these installations helped avoid 7,450 tonnes of CO₂ emissions. #RenewableEnergy
1
10
452
Musadaq Zulqarnain retweeted
With 780 differently-abled colleagues across our teams, being able to connect matters every day. This #InternationalSignLanguagesDay, supervisors joined @connect_hear sign language sessions to make everyday communication easier. #Inclusion #Interloop
2
7
376
Musadaq Zulqarnain retweeted
Interloop has produced Alzheimer Socks since 2015, helping raise €4M+ for research at @amsterdamumc. This #WorldAlzheimersDay, that support continues to help understand Alzheimer's better and detect it earlier. #AlzheimerSocks #Interloop
2
8
412
Musadaq Zulqarnain retweeted
1. Amazon and other AI operators install simple-cycle gas turbines because they start in minutes, sit behind the meter, and skip years of grid interconnection. The same logic applies after sunset: the system needs fast-ramping firm energy. Batteries cover seconds to a few hours if already charged. Open-cycle turbines and gas engines cover the hours after that, because run-time is set by fuel, not by pack size. 2. Pakistan is moving into the same duck-curve challenge. Rooftop and behind-the-meter solar are depressing daytime grid demand, while load rises sharply after sunset. In this setting, gas plants may be dispatched in open-cycle mode because the system is not procuring efficiency alone. It is procuring flexibility: fast ramping, dependable capacity and megawatts available when solar output falls. 3. Yet when the same flexibility sits behind an industrial meter, policy classifies it as inefficient captive generation. Spinning mills use reciprocating gas engines and open-cycle units to firm rooftop solar, maintain bus voltage, supply or absorb reactive power, and carry critical load through grid disturbances so continuous processes do not trip. An online gas engine can increase output within seconds to minutes as PV generation falls. This is local balancing at the point of load, avoiding upstream network losses and bypassing the wider AT&C burden of roughly 20-25% embedded in grid supply. 4. Yet high captive-gas tariffs and the Off-the-Grid Levy crowd out this technically valuable flexibility resource. OGRA’s prescribed gas cost is around Rs 1,719/MMBtu, while the effective captive burden can approach Rs 5,000–6,000/MMBtu, in some cases exceeding the energy-equivalent notified LPG price. At the same time, industrial grid electricity remains around 12–13¢/kWh against roughly 5–7¢/kWh in competing markets. 5. The contradiction is policy, not thermodynamics. Fast-start gas is “essential flexibility” when it powers an AI campus or balances the national grid, but “inefficient captive generation” when it keeps an export mill operating. A rational energy policy should value generation by its efficiency, flexibility, reliability and system contribution, not by who owns the machine. 6. The Off-the-Grid Levy undermines price discovery, penalizes efficiency and creates a fundamental cross-sector pricing distortion. By benchmarking captive generation against the B3 electricity tariff, it loads part of the power sector’s fixed-cost burden, including surplus capacity, low utilization and other system inefficiencies, onto industrial gas pricing. 7. When cheaper LNG, private imports, TPA, better procurement or higher efficiency reduce self-generation costs, the differential widens and creates additional levy headroom instead of allowing those gains to flow fully to consumers. The better the price discovery and the higher the efficiency, the more room the mechanism creates for levy extraction. 8. The mechanism therefore turns efficiency into taxable headroom and competition into a source of levy recovery. It forces industrial gas consumers to absorb costs created by surplus power capacity, low utilization and other grid inefficiencies, directly undermining the OGRA principles of efficient, competitive and distortion-minimizing pricing. T 9. The Captive Levy is not a gas-pricing reform. It is a cross-sector cost transfer: power-sector inefficiency is loaded onto industrial gas tariffs, while the resulting distortion is presented as reform. @PakPMO @Financegovpk @MIshaqDar50 @betterpakistan @sifcpakistan @jam_kamal @AliPervaiz450 @akleghari @Gohar_Ejaz1 @BilalAKayani @IhsaanaKhan @APTMAofficial @AptmaUncut @FPCCIOfficial @MusadaqZ @shahzadsaleem @mukhtarkhurram @nadeemhaque @rehanjawed @rogueonomist @AliKhizar @Asad_Ashah
1. The main problem in Pakistan’s gas sector is that price no longer reflects cost, and allocation no longer follows economic value. This is the root of the sector’s economic distortion and a core regulatory concern that OGRA is duty-bound to address. Gas is a scarce economic resource. It should flow toward its most productive, efficient and high-value uses, but the present system allocates it through administrative pricing, priority lists, load-management policies and utility discretion. 2. As a result, the cart is placed before the horse. Supply decisions are made first, while cost causation, payment responsibility and economic efficiency are addressed later. Instead of price guiding allocation, allocation is decided administratively and the cost is then spread across consumers through tariffs, subsidies, cross-subsidies and blended pricing. This weakens regulatory accountability and turns gas pricing into a recovery exercise rather than a transparent economic signal. see this centerforenergystudies.com/p… 3. The consequence is a distorted market in which efficient and paying consumers can be burdened with costs they did not cause, while lower-value or politically protected consumption remains insulated from its true cost. This breaks the basic regulatory principle that every cost must have a cause and every tariff must be transparent, fair and defensible. 4. At the utility level, OGRA determines the revenue requirement of SNGPL and SSGC through a regulated cost-of-service and rate-of-return framework. This means OGRA assesses gas cost, network cost, depreciation, UFG, approved investment and allowed return. But at the consumer level, the Federal Government allocates this cost through administratively differentiated sale prices, subsidies and cross-subsidies. This separation between cost determination and price allocation is where the distortion begins. 5. The result is that gas becomes a political commodity rather than an economic resource. Instead of being priced according to marginal cost, scarcity value, payment discipline, efficiency and economic output, it is priced and allocated through policy discretion. Some consumers pay below cost, while others, especially industrial consumers, are loaded with costs they did not cause. This weakens cost causation and turns tariff design into an exercise in political balancing rather than economic regulation. 6. The blended industrial tariff shows the problem most clearly. OGRA may determine the prescribed price, but when a gas utility applies a notional RLNG blend through billing practice, the effective payable tariff is shaped by the utility’s internal allocation decision. This undermines OGRA’s tariff finality. A transporter or utility should not be able to reset the consumer’s payable tariff outside the lawful regulatory determination process. 7. If industry receives indigenous gas, it should pay the indigenous gas price plus transparent network charges. If it receives RLNG, the utility must prove actual RLNG allocation through reconciled volumes, metering data, sector-wise offtake and cargo-wise cost attribution. Physical commingling in the pipeline cannot become a blank cheque for economic averaging. No blended tariff should be charged without allocation proof, cost causation and an OGRA-approved methodology. 8. The Federal Government’s gas load-management policy further deepens the distortion. Once utilities are allowed to manage supply by category, region and priority, actual allocation again depends on the discretion of SNGPL and SSGC. For industrial consumers, this creates a moving target: they cannot know with certainty what gas they are receiving, what blend they will be billed for, or whether the price reflects actual supply. 9. This is not a functioning market. It is a distorted arrangement in which costs are obscured, cross-subsidies become embedded, efficient consumers subsidise inefficient consumption, utilities remain incentivised to expand regulated assets, and tariff shortfalls accumulate as circular debt. The system is not failing because of one LNG contract, one UFG dispute or one billing issue. It is failing because market design has broken the link between cost, price, allocation and accountability. 10. Pakistan’s gas sector is not governed by a clean cost-reflective pricing framework. It combines regulated cost recovery at the utility level, political price allocation at the consumer level, and discretionary supply management by gas utilities. This hybrid structure weakens efficiency incentives, distorts price signals, undermines regulatory tariff finality, breaks the link between cost and causation, and turns gas-sector circular debt into a structural outcome rather than an accidental shortfall. 11. Gas market liberalization is therefore not an ideological choice; it is the necessary correction to a distorted market design. a) Pakistan must move from bundled monopoly control to open access, from political allocation to cost-causative pricing, and from hidden cross-subsidies to transparent, targeted support. b) Pipelines should operate as neutral common-carrier infrastructure, gas sales should be separated from transportation, and qualified consumers should be allowed to contract directly with E&P companies, private LNG suppliers and licensed shippers under a transparent Use of System Charges regime. c) This would improve price discovery, reduce reliance on the Sui utilities as monopoly suppliers, unlock indigenous gas for productive industry, attract private investment, strengthen payment discipline and reduce circular debt pressure. The objective is simple: gas should flow to the consumers who value it, pay for it, and use it most efficiently.
2
2
2
6
3,707
Musadaq Zulqarnain retweeted
Interloop won Bronze at the Employer of Choice Gender Diversity Awards by @IFC_org and @ThePBC_Official. From women in STEM and leadership to fair pay and an inclusive workplace, the assessment looked at how gender equity shows up at work. #GenderDiversity
1
1
10
709
Musadaq Zulqarnain retweeted
2,577 people trained at Interloop's Technical Training School. 42% of them women. #WorkforceDevelopment #CreatingOpportunities
1
2
6
451