Who owns Grasberg?
Freeport-McMoRan 48.76%, MIND ID 26.24%, PT Indonesia Papua Metal dan Mineral 25%, per Freeport's 2025 10-K.
OpenOre now traces ownership to 100% for 553 major mines, each stake linked to the filing it came from. openore.io
A mine is only as good as its route to market.
OpenOre maps 112 mineral corridors (rail, road, port, power) and the mines that depend on them, from Lobito to Pilbara.
See a corridor on the Atlas: openore.io/atlas
Project Evidence Dossier: reported payments by an asset's linked owners and operators, on the asset page. Only human-confirmed matches — missing evidence is stated, not papered over. That discipline is the product. openore.io
3
What a drill result needs before it enters OpenOre Signals: hole ID, interval, from-depth, true width.
WA1: 38.1 m at 4% Nb2O5
Core: 92 m at 1.25% Li2O
Hycroft: 19.6 m at 30.49 g/t Au
A grade without an interval is not a result.
openore.io
30
Mercuria delivered 12,000 t of Congolese copper into Project Vault, the US critical minerals reserve. First physical delivery we have recorded.
It comes from Gecamines' 20% of Tenke Fungurume, a Chinese-operated mine, moved by a Swiss trader.
openore.io
14 Oct: US Treasury asks the World Bank to catalyse deep-sea mining.
15 Oct: Greenland's parliament votes unanimously to ban it to 2029.
16 Oct: the Bank sets US$19bn to 2030, from US$3.6bn.
The money is growing. The permission is not.
openore.io
FLS booked two Chile copper orders in two days. Neither names the mine.
DKK 360m: world's largest gyratory, 40ft SAG, three ball mills, 90+ MW. Commissioning 2029-30.
DKK 175m: a second grinding line.
Mills are ordered years before concrete.
openore.io/signals
5
Two offtakes this week. One mine running, one not built.
Elevra to LG Energy Solution: 240,000 t spodumene over 4 years from an operating Quebec mine.
Traxys at El Moto, Spain: exclusive, 10 years from first production. That mine does not exist.
openore.io/signals
9
A connection you cannot audit is a guess.
55,882 links between mines, deposits, licences, ports, power plants and corridors.
Every one declares how it was made:
54,603 from geometry
1,074 attribute match
205 by hand
21,383 with a source URL
openore.io/atlas
8
Five processing plants this week. Not one mine.
Westwin: $502m nickel refinery, MS
Hertha: $100m iron plant, Texas
Titan + US Army: Alabama graphite
Steenkampskraal: monazite plant
Aclara + CAP: rare earths, Chile
The bottleneck is not the rock.
openore.io/signals
45
The OpenOre Atlas now opens in satellite view: mines, licenses and corridors on real imagery from the first load. Light, Dark and Terrain are still in the basemap menu.
openore.io/atlas
10
















