Every project starts with a strategy: why it's being done, what it must achieve, the budget and the date. Between that and the first day sits a question that is easy to underestimate. How is it going to be delivered? The Project Execution Plan is where that question gets answered
Every project has a risk register. Far fewer have one that actually changes what happens. The difference usually comes down to how the risks are written, because a risk that is described vaguely cannot be managed precisely. If you want fewer surprises, talk to Projex Solutions.
A well-run HAZOP is one of the most effective tools in process safety. It brings the right people together, works through the design, and finds hazards that no single discipline would find alone. If you have HAZOP actions still open, or a study coming up, talk to Projex Solutions
Regulatory requirements rarely stop projects because the design cannot comply. They stop because nobody identified early enough what was needed, and how long it would take to get. By the time it is discovered, it's too late. Talk to Projex Solutions before the programme is set.
FEED is often treated as a fixed scope: produce a standard set of deliverables to a standard depth, then move to sanction. Smart FEED is different. If you are approaching FEED and want it focused where it counts, talk to Projex Solutions.
Every process plant is designed to perform but performance means different things to different people: throughput, yield, product quality, energy per tonne, uptime, changeover time. If you want a process designed to a performance standard you can measure talk to Projex Solutions.
Often big gains in sustainability come from simple decisions: using less energy, wasting less material, and not replacing equipment that still has years of useful life left in it. If you're planning a project and want it to leave a lighter footprint, talk to Projex Solutions.
A plan is a prediction. Execution is what happens when that prediction meets a real site. The gap between the two is where projects are won or lost.
If you have a project moving from plan to site, talk to Projex Solutions about how it will be delivered.
There is a difference between an engineer who can cover several disciplines and a team of specialists who each know one discipline deeply. If your project needs more than one kind of expertise, talk to Projex Solutions.
A process plant project involves more moving parts than most people outside it realise. If you want a project that is managed for you rather than by you, talk to Projex Solutions.
Most engineering relationships reset with every new project. If you want an engineering partner who remembers your site as well as you do, talk to Projex Solutions.
We are proud to share that Projex Solutions has been named a finalist for the Excellence in Equity, Diversity and Inclusion Award at the 2026 IChemE Global Awards.
Thank you to IChemE for the recognition.
Jamie Ashton, our Managing Director, is at the Made in Yorkshire Expo today at the Accu Stadium in Huddersfield.
Jamie will be wandering around as a delegate. If you are there today, be sure to keep an eye out for him and say hello.
We're pleased to announce that Projex Solutions has once again successfully achieved SafeContractor accreditation! Safety is a shared responsibility, and this achievement reflects the commitment of our entire team.
Scope gaps rarely sit in the middle of a project. They sit where one package ends and another begins, where new plant meets existing plant. If you are defining a capital project and want the scope closed before it is priced, talk to Projex Solutions.
A FEED package is often judged by its drawings and its cost estimate. If you are starting FEED and want the safety and operability decisions made deliberately, talk to Projex Solutions.
A turnaround is the most compressed and highest-risk period in a plant's year. If your next turnaround is being planned now, talk to Projex Solutions about keeping its scope under control.
A DSEAR risk assessment is only as good as the list of places it considered. Zones that are never identified are never classified, never assessed for ignition sources and never fitted with suitable equipment. Need a DSEAR risk assessment? Talk to Projex Solutions.
Tomorrow is World Mental Health Day. So make sure to check in with someone. Ask how they are, and ask again if the first answer sounds automatic. Slow down, listen to the answer, and really take note of what they're trying to tell you. Sometimes being heard is the whole point.





















