The Global Transits (@TheTransits) header
The Global Transits (@TheTransits) profile picture

The Global Transits is a Pro Rapid Transit Channel, which shows you some Trivias, Facts and Details of the Rapid Transit System all across the India and world.

Mumbai, India
Joined December 2020
Photo by The Global Transits (@TheTransits)Photo by The Global Transits (@TheTransits)Photo by The Global Transits (@TheTransits)Photo by The Global Transits (@TheTransits)Photo by The Global Transits (@TheTransits)Photo by The Global Transits (@TheTransits)Photo by The Global Transits (@TheTransits)Photo by The Global Transits (@TheTransits)Photo by The Global Transits (@TheTransits)Photo by The Global Transits (@TheTransits)
A Happy and an Unforgettable day as a Metro Enthusiasts 😀😊 Finally I've Spotted BEML Rake departing Akurli Metro Station during Trial Runs on Mumbai Metro Red Line(L7). I almost cried when I saw her with my own Eyes. ⒸThe Global Transits
15
17
1
188
So Finally Patna will get its own Rolling Stock as DMRC has Floated Tender to supply 102 Coaches (34-3 Coach Trainsets) for entire Patna Metro Phase 1. Until now, Operations are being handled through a single 3 Coach Titagarh Trainset borrowed from Pune Metro.
1
168
Mumbai Metro Line 9 It seems that @MMRDAOfficial has made some changes in the plans of NSCB Stadium Station. The Platforms were extended towards Maxus Mall to support 6 coach trains whereas no progress were seen on the other end. Idk what's going on now ?
2
8
84
2,255
Its not nice, its a Masterpiece. I hope that these trains will get their own home after temporary arrangement.
Mumbai Metro line 4, Alstom Rakes. 📸 : Anushree Gaikwad.
2
37
733
Par rakhenghe kha, Depot kha kaam toh start hi nahi hua Hai. BEML borrowed trainsets have already occupied viaduct, hence carshed work must to be resolved.
This quoted post is unavailable.
3
22
1,392
If there was no drama for Line 9 Depot, then atleast the Depot would be around 30%, but now there is no update at all about Line 9 Carshed. We definitely believe that Elevated stabling yard plan will be a failure and only proper carshed can solve operation issue.
मेट्रो मार्ग ५ साठी कशेळी डेपोचे २३% काम पूर्ण. २७ हेक्टर क्षेत्रातील हा डेपो ठाणे–भिवंडी–कल्याण–उल्हासनगर मेट्रो मार्गाच्या परिचालन, देखभाल व रेल्वेगाड्यांच्या स्थिरीकरणाचा प्रमुख केंद्रबिंदू ठरणार आहे. therajkaran.com/kasheli-metr… #MMRDA #MumbaiMetro @MMRDAOfficial
1
2
247
Kya Baath hai. THIS WILL BE THE LAST CHANCE.
The last option we have is beside Mira Road Railway Station where currently casting yard is there for DBLR. This land is of Government and can be used after the use of casting yard is over. @MMRDAOfficial @Explorer_Yash @RahulChels . MMRDA please leave your laziness!!
1
1
5
592
FINALLY THE DAY COMES 😃 The much awaited Phase 1 of Mumbai Metro Line 9 (Red Line Mira-Bhayander Extn.) From Dahisar East to Kashigaon has been open to the public. With this Direct trains are now available from Kashigaon to Gundavali at a length of 21 Kms
1
12
148
4,022
Some other pics and videos
5
263
The Global Transits retweeted
आम्ही तुमच्या सेवेसाठी सज्ज आहोत. मेट्रो मार्गिका ९ आणि मेट्रो मार्गिका २ब, तुमचा स्मार्ट, सुखद आणि सुरक्षित प्रवासाचा पर्याय! We are getting ready to serve you. Metro Line 9 and Metro Line 2B, your smart, comfortable and safe travel choice. @Dev_Fadnavis @mieknathshinde @DrSanMukherjee #MumbaiInMinutes #MMRDAMovesMumbai #MetroLine9 #Metro2B
6
17
95
4,733
What the hell is going on with Mumbai Metro?1st Line 9 and then Line 6 where they will get only elevated stabling lines instead of proper carshed.This jugaad concept not only impact Frequency but also temporary closure of the line for major overhaul of trains.Such a stupid idea.
⏳ Mumbai’s Metro Line 6 (Pink Line) is now likely to open in second half of 2026. 🛠️ MMRDA to operate the line without Kanjurmarg depot for now. ⬆️ In the absence of a depot, an elevated eight-lane maintenance corridor equipped with pit lines is currently under construction. swarajyamag.com/news-brief/m…
2
1
12
905
Get ready with the EP-2 of our Livestream program RAILWAY PE CHARCHA with @Bh_trainspotter Starting from 5pm on our Instagram.
1
5
272
Nothing, this is TMT's new Bus Service From Thane Rly Stn West to Lagos Nigeria via Dubai.
WHAT THE ACTUAL ..... ?????? 🤯🤯🤯🤯
2
203
Traveling all the way to CSMT just to have a Vada Pav from a well famous location can considered a reward. What do u think ?
1
1
1
30
2,200
I don't know what's happening but nowadays Majas Depot no longer operates Olectra Buses for A705. Nowadays MUT has taken responsibility to operate route 705L From Majas Depot to Western Park (Mira Road). Where are Majas Olectras?
3
6
507
Mumbai Metro Line 9. High speed Trials underway even at 3am between Dahisar Check Naka and Kashimira.
1
1
29
1,619
Mumbai Metro Line 9 Finally serious Trial Runs are being conducted. MMRDA has deployed 2 BEML trainsets to conduct testing on a 5.3Km section of Mumbai Metro Red Line From Ovaripada connection to Kashigaon. The planned opening for Line 9 is Dec 2025.
1
10
2,710
Yesterday got a chance to have a ride on a BEST's new face PMI Buses on a Route A84 all the way From Oshiwara Depot to Marine Drive via Coastal Road, never expected to be so comfortable and even quieter than Olectra...
7
13
121
3,405
1st look of Alstom trainsets for Mumbai Metro Green Line has been revealed, TBH they look even better than Aqua Line trainsets.Deliveries are expected to start by 2027 and it will be park at Mogarpada Depot and Anik Nagar Depot. Hope Mogarpada Depot work will start after monsoon.
We’re proud to partner with @larsentoubro for Mumbai Metro Line 4. Alstom will deliver 234 Metropolis cars, CBTC signalling & 5 yrs of maintenance, designed & made across our sites in Bengaluru, Sri City, Coimbatore & Savli. Read More: ow.ly/HE0i50WLRgg #MakeInIndia
14
691