The Portal maintenance has been completed. You should now have access to your Portal account. If you have any issues accessing your account, please get in touch with us.
16
The Portal maintenance is taking longer than expected. We are extending our maintenance window until 8:30 PM PST. Portal is still unavailable; however, you can email, call, or start a chat to reach us. We apologize for any inconvenience this may cause.
1
42
As a reminder, we will be performing maintenance on Portal tomorrow, November 18, from 3:00-7:00 PM PST. During this time, Portal will be unavailable; however, you can still email, call, or start a chat to reach us. We apologize for any inconvenience this may cause.
2
35
We will be performing maintenance on Portal on Wednesday, November 18, from 3:00-7:00 PM PST. During this time, Portal will be unavailable; however, you can still email, call, or start a chat to reach us. We apologize for any inconvenience this may cause.
1
30
We are done with our power testing and everything looks good. The Generator and transfer switch are working well and we did not find any other issues within our infrastructure.
2
33
We will be starting the power failure/transfer tests in 15min (6PM PST). We have techs in place to keep an eye on everything and will revert immediately if needed.
38
We will be performing emergency network maintenance tonight on one of our network devices, starting at 9 PM PT. This will cause portal and some of our websites to be unavailable. We expect it to only last about 20 minutes. We apologize for any inconvenince that this may cause.
40
Tonight @ 6:00 PM PST we will be performing a power failure/transfer test at our datacenter. We are not expecting any outages. We will roll back to utility power if we run into any problems and get equipment back online as quickly as possible.
42
Things are fully backup. There was a bug in the router we rebooted that caused traffic to not forward traffic. That was resolved. We now have a new provider that we are routing on. We also made some good progress today as we move to add additional redundancy to the network.
1
48
We have been making progress on the networking changes. We still have a little more work to get done tonight. We are extending the maintenance time 1 more hour. as we work on finishing up configuration changes and need to do some router reboots.
54
We will be performing network maintenance this coming Wednesday the 4th starting at 9 PM PT. The maintenance will last for 1 hour. There will be some temporary service interruption. We apologize for any inconvenience that this will cause.
54
We will be performing maintenance on portal Monday starting at 9 PM PT. Portal may be slow, but it should remain available. We apologize for any inconvenience that this may cause.
49
Sorry about all the changes, we need to do the Most recently posted changes to Portal in just a few minutes. So that we can do the other already scheduled work at 9:00pm PDT.
43
Small change to the maintenance going on, with portal tonight. The maintenance will involve shutting down Portal completely. Sorry for the inconvenience. This will happen at 9 PM PT still.
33
We will be starting the generator load/cutover test in 15min (6pm PDT). We have techs in place to keep an eye on everything and will revert immediately if needed.
28