Voltano (Pty) Ltd retweeted
Our electricity team managed to restore power to parts of Centurion which were left in the dark after two transformers caught fire at #Brankfontein substation. If you are experiencing power interruption, pls SMS the word 'Power' followed by your acc no to 0826120333 or 44676
Voltano (Pty) Ltd retweeted
Here are some general tips on what to do during #loadshedding 👇👇👇 @CityPowerJhb @City_Ekurhuleni @CityofCT @eThekwiniM
Voltano (Pty) Ltd retweeted
#PowerUpdate there has been a 132kv trip in Lyttleton affecting Eldoraign, Raslouw, De Howes, Olievenhoutbosch and Kosmosdal. Our team is busy attending to the problem. We apologize for the inconvenience caused to affected residents.
Voltano (Pty) Ltd retweeted
Replying to @LiezelSmith87 @Voltano
Good evening, please note that the power is off due to 132Kv trip. Our technicians are busy attending to it.
Voltano (Pty) Ltd retweeted
Replying to @LiezelSmith87 @Voltano
Good evening, please note that the task is still in progress. ETR not yet available.
On average we use 15-20% more electricity during winter months. A reminder to switch it off if you are not using it.
#Stenostelma. Power outage in surrounding areas. Waiting on feedback from Council.
Parts of #Wonderboom, #Annlin & #Sinoville without water due to damaged bulk water pipe #waterinterruption (1)
#Stenostelma We are aware of the water disruption. Tshwane is repairing a main supply line.
Voltano (Pty) Ltd retweeted
#Montana #powersupply update: The @CityTshwane team of technicians is still busy on site trying to restore power.
Capetonians urged to keep up water-saving efforts despite rain m.news24.com/news24/SouthAfr… (via )
Voltano (Pty) Ltd retweeted
#Power will be restored to some areas on remaining lines but overload can cause trips. #Woodhill, Garstfontein, #Pretoriuspark #cabletheft
Voltano (Pty) Ltd retweeted
#Poweroutage in large part of #eastern areas of @CityTshwane due to a trip of main feeder cable at the #Njala substation.
Voltano (Pty) Ltd retweeted
We are committed to attending to each and every power failure in the city. We wish to apologise to our residents for this inconvenience 3/3
Voltano (Pty) Ltd retweeted
Replying to @LiezelSmith87
kindly note the turn around time for an area outage is 8 to 10 hours. We apologise for the inconvenience caused.





