Seems like the Fast & Furious Hollywood Drift pull test is paused until the service platform along the brake run is complete. (2 photos)
Peterbilt truck and first launch of Fast & Furious Hollywood Drift silhouetted by construction lighting.
3 photos of studs added for exterior walls of the additional facade in development outside the Fast & Furious Hollywood Drift station.
3 aerial photos of work at the rerouted Floridian Way and the 2 roundabouts at Grand Floridian Resort.
Sept 18
A nicknamed "Imagineering in the round" view of Cars Ridge Run Rally construction.
Crews have begun shaping the concrete foundation for the Cars Ridge Run Rally attraction at Magic Kingdom. We have on-the-ground photos along with aerial photos of the major milestone!
🔗 blogmickey.com/2026/10/concr…
Aerial video of Disney's Lakeshore Lodge construction. Featuring The Wetlands, the primary pool courtyard. The resort also includes several A-frame villas along the shore.
The impressive concept model was recently added to Walt Disney Presents in Disney's Hollywood Studios.
Video: Ground view of the Fast & Furious Hollywood Drift switch track in operation.
Track at right for ascending The Spike. 1st movement is to the left, to align with this track. Cars pass and enter the Speed Bump, top right.
Track at far left for descending cars. 2nd movement.
The Fast & Furious Hollywood Drift pull test car staged for rising up and into the brake run at the station. There will be trains of 4 rotating cars.
In foreground is the first launch.
Rare opportunity to view almost straight up and into the Fast & Furious Hollywood pull test car.
These types of views to be through safety netting soon.
Thunder Falls Terrace closed July 19, with an announced plan it will become the featured restaurant of Islands of Adventure. Replacing Mythos Restaurant.
The cafeteria serving lines and seating are unchanged. As seen tonight, Oct 21.

























