JustaKeelGuy (@justakeelguy) header
JustaKeelGuy (@justakeelguy) profile picture

Medical device sales by day🩺 Tracking the $KEEL transformation by night💻

Detroit, MI
Joined February 2026
Photo by JustaKeelGuy (@justakeelguy)Photo by JustaKeelGuy (@justakeelguy)Photo by JustaKeelGuy (@justakeelguy)Photo by JustaKeelGuy (@justakeelguy)Photo by JustaKeelGuy (@justakeelguy)Photo by JustaKeelGuy (@justakeelguy)Photo by JustaKeelGuy (@justakeelguy)Photo by JustaKeelGuy (@justakeelguy)
The stars are aligning for $KEEL
🚨 @AnthropicAI and @OpenAI Now Hunting for Smaller Data Center Deals 🚨 ⚡ 20-30 MW deployments targeted — a sharp pivot from the multi-hundred-MW and gigawatt megadeals both labs signed over the past year (@AnthropicAI 's $45B @nscale /West Virginia deal, @OpenAI 's 10GW+ Stargate) ⚡ "Speed to usable capacity" is the driver — per Structure Research's Jabez Tan, securing a few MW at an existing powered site beats waiting years for one giant block ⚡ Inference is reshaping demand — per JLL, inference made up just 9% of global data center workloads in 2025 vs. 14% for training, but is projected to hit 37% by 2030 as training falls to 13% ⚡ UK and Nordics in focus — @AnthropicAI has sounded out smaller deals in both regions; @OpenAI has explored similar Nordic opportunities, with US talks also reportedly underway ⚡ @CrusoeAI pivots too — fresh off a $3.9B raise at a $30.9B valuation, Crusoe is now building smaller, faster, cheaper facilities as larger US builds face mounting delays
4
15
146
11,313
Powered shells > full-stack neo clouds right now. Power is the bottleneck. Not chips. Not software. The companies that control energizable power + shells are signing 15–20 year leases with strong counterparties and transferring the GPU risk to the tenant. Neo clouds capture higher revenue per MW, but they own the depreciating asset and carry the financing and utilization risk. In this cycle the scarce real asset is the powered shell. Everything else is a higher beta trade on top of it. The market is still treating these two models too similarly. That won’t last. $KEEL $NUAI
5
22
859
Tough times don’t last, tough people do.
2
14
455
Bored, not concerned. $KEEL
4
4
40
3,592
Deal economics in AI infrastructure are improving for the landlord. Two recent Frontier AI Lab comps show the shift: WULF (Anthropic, 401 MW): 20-year term, $19B contracted ($2.37M revenue per MW/year). More traditional campus build — landlord delivers a higher level of finished infrastructure. CapEx $10–12M/MW. 85% NOI margin. 18% yield on cost. RIOT (Corsicana, 910 MW): 15-year triple-net powered land lease, $28B contracted ($2.0M revenue per MW/year). Landlord delivers land, power infrastructure, and powered pads. Tenant brings the GPUs (same as WULF) and pays nearly all operating costs. CapEx only $6M/MW. 99% NOI margin. 33% unlevered yield on cost. Same class of tenant. Similar revenue per MW. The difference is how much of the build the landlord has to fund. The newer structure is more capital-efficient and higher-margin. This is the trend: as power becomes the scarce asset, landlords who control it can negotiate lighter CapEx and higher-margin structures instead of carrying full facility builds. $KEEL already has the power secured and is still in active negotiations. No pressure to sign the first deal that shows up — they have the cash to wait for the best structure and terms. While others race to lock something in, $KEEL can let the comps keep improving and take the higher-quality version of the same deal. The first signature will re-rate the entire company, and they get to pick the one that maximizes it.
2
3
23
1,884
After the swings this year, a green Christmas in the markets would be fitting. Starting to look possible. Where do you guys see $KEEL sitting come late December?
9
19
3,903
Everyone take a mental screenshot of colocation stock prices right now. A few years from now this is going to be hilarious. $KEEL $CIFR $WULF $HUT $APLD $NUAI
3
1
39
1,955
Yes, data center development and operating costs are rising. That has a lot of people questioning how profitable these businesses will stay. $KEEL is in a different position. They’re not locked into ANY deals. They fully understand the volatility of these costs. As costs go up, they will charge more and protect their economics. It’s that simple. We’re in the driver’s seat now; we’re bullet proofing the thesis.
12
3
1
95
8,099
So many people thought this was “first to market to provide this service wins”… It was the opposite.
1
7
738
We’ve seen this exact setup before. The rip is coming. Look your portfolio dead in the eyes while it’s bleeding red and keep buying.
7
5
39
1,665
Stepping away for a bit. I’ll see y’all when we take off. $KEEL
3
1
54
3,649
Lost count of how many people have called me an idiot for this “all in” $KEEL position. Still here. Still adding. ⏰🔜💰
6
3
69
3,681
My pronouns are all/in $KEEL
2
9
1
117
4,155
‼️‼️‼️‼️‼️‼️‼️‼️‼️‼️‼️‼️‼️‼️‼️‼️
There’s something insanely efficient about just going all in on one stock and knowing literally everything about it.
2
1
16
2,269
POTUS is pulling the rope in the right direction 💪🏼
President Trump calls Jensen mid-interview at the All-In Summit to say AI taking over the world is a hoax Jensen: "Mr. President? I've got to tell you something. If it wasn't because of you calling, I would... I'm on stage with the besties." Trump: "You see, the great thing about life is that Jensen can develop the most complex computer chip in the world that nobody can copy for 10 years, but he can't figure out how to put me on speaker." "So, the AI, it's almost a conspiracy, and the happiest group is China, they're very happy." "I'm telling you, it's all a hoax. The data centers are great and they make people wealthy and they make states wealthy and it's the oil of the next 20, 25 years. It's bigger than the Internet." "The robots are not going to be taking over the world and that's not going to happen. The AI will not be taking over the rest of the world. The whole thing is a hoax." "Now, with that, we have to be a little bit careful, but that doesn't mean we're going to stop an industry. So I'm with you all the way."
1
8
1,074
Data center companies don’t need AI to keep scaling.
A few people asked over the weekend what the calls to slow the pace of frontier AI mean for the buildout. Some thoughts: Even if models never improved from here, just rolling out what they can already do would take more compute than the world can build for years. The debate about how fast AI should be allowed to improve is a fair one to have. It's about future generations of models. Existing demand is the part I think people are misreading. Anthropic CEO Dario Amodei said in May they'd planned for 10x growth and were running at an 80x pace in the first quarter, and that's why they've had trouble supplying compute. OpenAI president Greg Brockman said in July they'll be in a compute shortage no matter what, and are choosing which products to scale. Google says it's processing 7x the tokens it did a year ago. Hundreds of millions of people use these models today, and most of them use a small part of what the models can already do. And every time more compute comes online, usage steps up again: limits come off for people already using it, customers who were turned away get on, and new use cases show up that weren't in anyone's plan. Now supply. The constraint is HBM, the memory that sits inside every major AI chip. Three companies make it and all three are sold out this year. A new memory plant takes years to build. TrendForce has HBM shipments growing 50-60% next year. NVIDIA, the biggest buyer of it, expects its revenue to grow about 70% next year and calls that outlook 'supply-constrained', noting its customers' forecasts point closer to 100%. On our own bottom-up work, the memory constraint lands in about the same place as NVIDIA's growth number. Then the chips need a building with power connected, which takes longer again. Goldmans reckons only about half the US capacity scheduled over the next two years will actually be built on time. The risk to demand continues to seem heavily weighted to the upside. The risk to supply continues to seem weighted toward less capacity getting built, not more.
2
3
23
1,663
Calculated risks × a little luck = Success. $KEEL
2
3
38
1,595
TeraWulf leased 401 MW to Anthropic for about $19 billion over 20 years. That works out to roughly $2.37 million of revenue per megawatt per year. That is not a projection. It is a disclosed lease. If $KEEL leased its full 2,300 MW pipeline at $2.375 million per MW, that would be about $5.46 billion a year. If you assume profit is about half of that, you get roughly $2.73 billion. A 15x multiple simply means valuing the company at 15 times that annual profit. In other words, $2.73 billion × 15 ≈ $41 billion. That is the same as saying investors would be paying about $1 for every 6.7 cents of yearly profit. It is a simple midpoint used on a lot of infrastructure and earnings based businesses, not a KEEL specific forecast. On about 618 million shares, a $41 billion market cap is around $66 a share. Including the convertibles, closer to 765 million shares, it would be around $54. Those are just the multiples applied to that profit assumption. A more conservative cap rate range on $2.73 billion would put the company closer to a $27–35 billion dollar market cap. ($35-46 price per share) KEEL has not signed those leases yet, and 2,300 MW is the full pipeline case, not current secured capacity. The value of the exercise is simply to put a number on what that power could be worth if it is contracted at the rates already showing up in the market. The stock will ultimately be priced on the leases, the timing, and how much of the pipeline actually gets built.
13
19
3
147
19,070
Shapiro just raised the bar on PA data centers and it’s a massive filter. Speculative projects without real power? Dead. Amazon wanting to drop a massive new DC in Pennsylvania? Good luck starting from scratch. The winners are the ones who already control the power and have local buy in. $KEEL family, welcome to the Goldilocks phase. PAY ATTENTION…
6
3
51
2,792
Shapiro just dropped the nation’s strictest data center rules in PA. Bring your own power. Pay for every kWh yourself. Local community veto. No more NDAs. Fast track? Gone. 2027/2028 power just got a lot more valuable and management saw this coming. The regulatory squeeze was always going to thin out the speculative noise and concentrate real demand on the few players who already control secured capacity. Ben never walked back the timelines. He just stopped talking about them. Why would you put a clock on a negotiation when you’re sitting in the driver’s seat? He got a little ahead of himself earlier because the setup was (and is) that good. Power is the bottleneck. We’re holding it. The rest is just process. This isn’t a setback for $KEEL. It’s confirmation of the thesis.
11
6
78
5,673
YOU WERE WARNED… TICK TOCK ⏰⏰⏰
I don’t think rushing data center development is as valuable as people think. Why spend extra money accelerating construction if you’re just going to wait for the right tenant once it’s finished anyway? The real value comes from signing the best long-term deals, not finishing a few months earlier. Slow cook that infrastructure and by the time demand really peaks, it’s at the perfect temperature for someone to eat. $KEEL
2
1
13
3,532
Ben pulling back his EOY signed deal timeline was positive imo. VALUE MAX
2
1
274