Rebrew.org (@rebrewx) header
Rebrew.org (@rebrewx) profile picture

Promoting the thoughtful creation and stewardship of beautiful, enduring places.

Joined May 2026
Photo by Rebrew.org (@rebrewx)Photo by Rebrew.org (@rebrewx)Photo by Rebrew.org (@rebrewx)Photo by Rebrew.org (@rebrewx)Photo by Rebrew.org (@rebrewx)Photo by Rebrew.org (@rebrewx)Photo by Rebrew.org (@rebrewx)Photo by Rebrew.org (@rebrewx)Photo by Rebrew.org (@rebrewx)Photo by Rebrew.org (@rebrewx)
The Kaufmann family loved one waterfall on Bear Run and expected a house with a view of it. Frank Lloyd Wright, at 67, put the house on top of the falls instead. It is Fallingwater, in Mill Run, Pennsylvania. The Kaufmanns were a Pittsburgh family. Edgar J. Kaufmann was heir to Kaufmann's department store, and for decades Bear Run had been a retreat for the store's employees. Wright first came to Bear Run in December 1934, and the family asked him for a weekend house there. By the accounts of Wright's Taliesin apprentices, the design came in a matter of hours in 1935. Fallingwater's own history says the first drawings, floor plans, perspective and section, were essentially the last. Wright told Kaufmann he wanted the family to live with the waterfall, not just to look at it. Wright built the house as stacked concrete trays cantilevered over the stream, anchored to a stone chimney of locally quarried Pottsville sandstone. A boulder from the site rises through the living room floor and serves as the hearth. Construction began in April 1936 and was completed in 1937. A guest house followed in 1939. In 1963 Edgar Kaufmann jr. gave Fallingwater and the land around it to the Western Pennsylvania Conservancy, and public tours began in 1964. In 2002 a team led by Robert Silman Associates installed post-tensioned steel cables beneath the living room floors, which stopped the cantilevers sagging further. In 2019 UNESCO inscribed Fallingwater and seven other Wright sites on the World Heritage List. That year 171,056 people visited. Wright set the house over the falls the family loved, with a boulder of the site at its hearth. The Cultural Landscape Foundation calls Fallingwater a supreme example of Wright's organic architecture, in which building, furniture and land are designed as one.
49
The Dark Hedges, County Antrim, Northern Ireland James Stuart built Gracehill House in about 1775, and the Stuart family planted an avenue of more than 150 beech trees along the entrance to the estate, meant to impress visitors as they approached the house. In 2014, 94 of the beeches were surveyed and recorded. In 2025 the Causeway Coast and Glens Heritage Trust took over their management. Villeneuvette, Hérault, France An avenue of plane trees leads to the monumental gate of a village that began as a cloth works, founded by Pierre Baille, a cloth maker of Clermont, in about 1675. In 1970 a local history journal called the planes more than a century old. The Platanenallee, Tübingen, Germany For decades a story said the town's last executioner planted this avenue of plane trees on the Neckar. Then scientists at the University of Hohenheim counted the tree rings and dated the planting to about 1830, years after his death in 1824. In 2013 the city archive found the long sought bill in its records for 1828. Wormsloe State Historic Site, near Savannah, Georgia In the 1890s Wymberley Jones De Renne laid out the live oak avenue to celebrate the birth of his son. It runs about a mile and a half and is lined with more than 400 live oaks. The State of Georgia has owned the site since 1973. These beautiful landscapes took decades to create. People continue to maintain them. At the Dark Hedges the road was closed to all but farm vehicles in 2017, for public safety and for the trees. At Wormsloe the state planned a trolley from its new visitor center to spare the oaks from frequent auto traffic.
30
Rebrew.org retweeted
"The men that conquered this land slept in mud, and their grandkids complained about the temperature of the wine" -Julius Caesar
Readers added context they thought people might want to know
This quote is not from Julius Caesar. It appears nowhere in his writings or ancient biographies such as Plutarch's Life of Caesar. en.wikiquote.org/wiki/Gaius_Jul… graciousquotes.com/julius-caesar/ perseus.tufts.edu/hopper/text?do…
102
2,367
70
26,744
387,328
The Pillsbury A Mill in Minneapolis ground flour from 1881 until 2003. Today the old mill complex holds 251 homes for artists, and water from the Mississippi, which once turned its water wheels, makes most of its power again. Charles A. Pillsbury opened the A Mill near St. Anthony Falls in 1881. Designed by LeRoy S. Buffington, it was the largest and most advanced flour mill in the world at its completion, its National Register nomination says. Two water wheels of 1,200 horsepower each supplied its first power, and the mill ran on water until the 1950s, when it was converted to electricity. The mill was named a National Historic Landmark in 1966. In 2003 it became the last mill on the Minneapolis riverfront to shut down, and the building stood empty. In 2011 the National Trust for Historic Preservation named it one of America's 11 Most Endangered Places. In 2013 the Twin Cities developer Dominium began turning the A Mill complex, four buildings in all, into the A-Mill Artist Lofts, affordable homes for artists, designed by BKV Group and built by Weis Builders. The lofts' community manager, David Lepak, said Dominium knew there was a need for affordable artists' housing. The budget, about $100 million by the National Trust's count, included federal and Minnesota historic tax credits. The builders kept a few of the old flour bins hanging from the ceilings, redid the Pillsbury's Best Flour sign in LED lights, and turned much of the basement into studios for clay, painting, photography and dance. New turbine generators set in the mill's old water-power canals supply more than 70 percent of the complex's power. The lofts were fully leased by December 2015. A building made to last can outlive the work it was built for. At the A Mill the stone walls, the flour bins, the sign and the old water channels were kept and given a new use.
19
Rebrew.org retweeted
Islamic terrorist stopped right before an attack by Jesus Christ. WATCH.
73
774
31
4,352
121,388
Rebrew.org retweeted
I believe the @nvidia board is not acting in the best interest of shareholders nor in a manner consistent with their fiduciary duties. What we know is that the board fired Jensen or forced his resignation for violating company policy and/or in response to the accusation of an affair with a spy. They did so without careful consideration of the impact on the company, its customers, its shareholders or other stakeholders. They rushed to judgment without the benefit of careful due diligence or even with a basic understanding of the facts. How do we know this? We know this by how quickly Jensen was fired and how little was known at the time of his firing. It takes time to convene a board meeting. There was time, maybe, for one Zoom. And this is a decision that should have been made by a board sitting in person and carefully deliberating the facts once they are known. And they should have slept on the decision and met again the day after to discuss the facts, the risks and the other implications of their decision. The timing and lack of information did not allow for careful board deliberation. While boards can fire a CEO for an inappropriate relationship with a subordinate, it should not be an automatic decision. That is why we have boards comprised of humans and not agents. A board should consider whether or not such a relationship was consensual or whether it was an abuse of power dynamics. And a board has to consider what the impact of the firing is on all stakeholders. If I were in this board, I would not have rushed to judgment based on articles in the media. I would have made sure the board had all of the facts so it could make a careful and informed decision. Boards of Delaware companies have a duty of care which means they must make informed, prudent and good faith decisions. This clearly did not happen here. What law firm is advising this board? Or is the board even taken good legal advice? It doesn’t look like it. And now the board is compounding its failures by insisting that there is no possibility for Jensen’s return as CEO. Why is it in the best interest of the company to foreclose the possibility of Jensen’s return and to do so before all of the facts are known? This is yet another breach of their duty of care. Furthermore, the board has launched an investigation whose scope is unknown. Investigations can be extremely damaging to a company and should be carefully targeted to address whatever facts need to be known rather than be overly broad in scope. In short, this looks like a series of major governance failures by directors that panicked due to headlines in the media. They likely felt compelled to do something because they were afraid of looking bad in the media, not because it was the right thing for them company. They couldn’t stand the heat. The board’s conduct here is shocking for a company of this scale and importance to our country and the world at large, particularly at this moment in history.
5,080
9,452
1,215
73,712
5,263,944
Just hit 1M views. Praise Jesus 🙏
520
5,152
198
27,461
338,701
A Follower Of Christ On Halloween
1,044
5,886
236
72,044
3,534,890
Rubio has it
Attorney is what you do. Your faith is who you are.
7
I personally don’t know how to be very useful. I am so grateful for the entrepreneurs and visionaries in this world.
Selling Oculus to Facebook in 2014 gave me money for helicopter flight lessons and developing a seastead called SLAB with a 1,000 year design life. The goal was to be cheaper than land and absent state/local laws that cripple critical American industries like metal processing, medical research/treatment, desalination, oil refining, chemical engineering, and more. Me and a few close friends cashed it up at a $1B valuation back in 2017, and while it still has a long way to go, there has been significant progress towards my goal of reviving manifest destiny and westward expansion. At a time when most of the seasteading community wanted to escape the US and smoke pot, this was the one project explicitly designed to make America stronger, a relief valve for ill considered or outdated rules and regulations. I am only talking about it now because a few media outlets got wind of me and some friends topping up the coffers and plan on calling SLAB my new floating AI datacenter project. It is way cooler than that, way older than that, and I hate looking like a hype-chasing consensus loser, so now you have to read this tweet.
11
NVDIA’s board is a threat to democracy
5
Grand Central Terminal opened in New York in 1913. In 1998 its restorers built a grand stair on the east side of its Main Concourse that appeared in the architects' original design but was never built. The terminal opened at 12:01 a.m. on February 2, 1913. Reed and Stem of St. Paul, Minnesota, were chosen for its design in 1903, and Warren and Wetmore of New York were named associated architects in 1904. Over the Main Concourse is a sky of 2,500 stars designed by Paul Helleu. In 1967 New York City's Landmarks Preservation Commission named the terminal a landmark. In 1968 the railroad that owned it leased the space above it for an office building, and the architect Marcel Breuer drew plans for a tower of 55 stories, later 53. The commission turned them down. Jacqueline Kennedy Onassis spoke up for saving the building, and on June 26, 1978, the U.S. Supreme Court upheld the city's landmark law in Penn Central Transportation Co. v. New York City, a ruling that set a national precedent for historic preservation. The Metropolitan Transportation Authority took over running the terminal in 1983 and retained the architects Beyer Blinder Belle. The restoration cleaned the marble and the vaulted ceiling, coated by years of smoke and grime, and built the monumental east stair that Warren and Wetmore had drawn. The renewed terminal reopened on October 1, 1998, after a $200 million restoration. Today the MTA owns Grand Central, and Metro-North trains run from it. Hundreds of thousands of commuters, tourists and passersby come through every day, the MTA says. A landmark law kept Grand Central standing, and its restorers finished it from its makers' own drawings.
58
wtf
We may need to get a little whiter so we can sneak in undetected
14
Built in 93 days… In 1919 W. Stewart Woodfill took a job as a desk clerk at the Grand Hotel on Mackinac Island, Michigan. In 1933 he bought it. This summer the historic hotel on Lake Huron opened for its 140th season. The Grand Hotel was built for the Mackinac Island Hotel Company, formed by the Michigan Central Railroad, the Grand Rapids and Indiana Railroad and the Detroit and Cleveland Steamship Navigation Company. Detroit architects Mason and Rice designed it, and builders led by contractor Charles Caskey finished it in 93 days. It opened on July 10, 1887, a summer retreat for vacationers who came by lake steamer and rail. Rooms cost $3 to $5 a night. Its front porch, about 660 feet long, became the meeting place of the whole island in the 1890s. In the 1900s the hotel supported an island-wide ban on automobiles. The law was passed but not strictly enforced until the 1930s. Horse-drawn carriages still carry guests from the dock to the hotel. Woodfill became sole owner in 1933. R.D. Musser Jr. joined the staff in 1951, and Woodfill made him president in 1960. In 1976 Musser and his wife Amelia began redesigning the hotel with architect Richard Bos and decorator Carleton Varney of Dorothy Draper and Company, and in 1979 the Mussers bought it from Woodfill. In 1989 the U.S. Department of the Interior named it a National Historic Landmark, and their son Dan Musser III became president. In 2016 and 2017 workers reconstructed 336 feet of the front porch, the first time in 50 years. In 2019 the Musser family sold the hotel to KSL Capital Partners, with Davidson Hotels and Resorts to manage it. A five-year restoration began in the winter of 2022 to 2023. For the 2026 season the front porch was restored again, with its historic roofline returned and all 44 columns restored. The Grand Hotel was kept by people who knew it from the inside: a desk clerk who became its owner, and a member of its staff who became its president and then its buyer. Between them they kept it for 86 years.
74
Elon Musk has contributed more to human progress than every politician who has spent their time harassing him combined. It's not even close.
1,845
8,391
341
85,258
889,502
Kansas City's Country Club Plaza sold for $660 million in 2016 and for $175.6 million in 2024, in a short sale after its owners defaulted on their loan. The Plaza is 15 blocks of shops, restaurants and offices styled after Seville, Spain. Developer J.C. Nichols began building it in 1922, and it is considered the first planned suburban shopping center in the United States, laid out for shoppers arriving by car. In January 2016 Highwoods Properties agreed to sell the Plaza to a venture of Taubman Centers and Macerich for $660 million: 18 properties with 804,000 square feet of retail and 468,000 square feet of offices, about $520 a square foot. It was 95% leased, with net operating income of $31 million in 2015. Highwoods said selling its retail-centric assets in Kansas City was a step toward its office focus. In 2022 a Nordstrom planned for the Plaza was called off. Its lot at 47th and Jefferson is still empty. In May 2023 the venture defaulted on a $295.2 million loan on the Plaza, and Macerich recorded a $101 million impairment as its share. That November, Flatland reported about two dozen empty spaces. On June 28, 2024, Macerich and Taubman closed a short sale of the Plaza to HP Village Management of Dallas, led by Ray Washburne, for $175.6 million. Macerich's annual report says the lender forgave the rest of the loan. Flatland reported the steep discount reflected in part a recent exodus of tenants. Macerich described what it sold as 971,000 square feet, so the price came to under $185 a square foot by its count, and under $140 by the 2016 count. Gillon Property Group, the Dallas firm Washburne leads, now runs it. Today a plan for taller buildings, 824 homes, about 150 hotel rooms and 1.7 million square feet of commercial and retail space has Port KC's backing for up to $1.49 billion in bonds and tax breaks. A Port KC committee advanced it in November 2026, and final approval is to be discussed in early 2027. The name on a landmark does not change. What it sells for follows its leases and its loan: $660 million when it was 95% leased, $175.6 million after a default.
1
2
93
Rebrew.org retweeted
Notice all the blind hate he is getting just for announcing that he is a Christian. "If the world hates you, knowthat it hated me first." - John 15,18
Jesus saves and God is good. 🕊️ I don't talk about it much, my faith is a big reason I feel so strongly about people who scam, cheat and steal. Right now there's a culture of people who think it's the only way to get ahead in our world. It's not only misguided, but self-defeating. It works short-term but it always ends the same way: My son, if sinful men entice you, do not give in to them. If they say, “Come along with us; let’s lie in wait for innocent blood, let’s ambush some harmless soul; let’s swallow them alive, like the grave, and whole, like those who go down to the pit; we will get all sorts of valuable things and fill our houses with plunder; cast lots with us; we will all share the loot” my son, do not go along with them, do not set foot on their paths; for their feet rush into evil, they are swift to shed blood... These men lie in wait for their own blood; they ambush only themselves! Such are the paths of all who go after ill-gotten gain; it takes away the life of those who get it. Proverbs 1:10-19
10
218
3
4,991
48,220
Washington National Cathedral took 83 years to build, from 1907 to 1990. Its first stone came from a field near Bethlehem, and it was paid for by donors, not by the government. The idea is older than the building. Pierre L'Enfant's plan for the capital imagined a great church for national purposes. In 1893 Congress chartered the Protestant Episcopal Cathedral Foundation, and in 1896 Bishop Henry Yates Satterlee identified Mount Saint Alban as the site. On September 29, 1907, President Theodore Roosevelt and the Bishop of London spoke as the foundation stone was laid. The stone came from a field near Bethlehem and was set into a larger piece of American granite. It is inscribed with John 1:14. The cathedral rose in Indiana limestone over the decades that followed. Bethlehem Chapel opened for services in 1912. The Gloria in Excelsis central tower, about 300 feet tall, was dedicated in 1964, and the nave in 1976. In 1977 construction stopped for lack of money. The final phase began on April 5, 1983. On September 29, 1990, 83 years to the day after the first stone, President George H. W. Bush spoke as the last stone, a 1,008-pound finial, was raised to a pinnacle of the west towers. By that summer the building had cost about $65 million, not counting inflation. The cathedral says it receives no direct support from the federal government or any national church body. Behind the high altar stands the Ter Sanctus reredos, a carved stone wall whose name means thrice holy. At its center is Christ in Majesty, surrounded by more than 100 statues of historical figures, apostles, martyrs and leaders of the Christian Church throughout the ages. So the cathedral's first stone carries the verse of the Word made flesh, and the wall behind its high altar is centered on Christ in Majesty. Not every building is measured by its return. This one was paid for by donors over 83 years, and it was finished. And the Word was made flesh, and dwelt among us (John 1:14)
1
43
Rebrew.org retweeted
Jesus could have called 72.000 angels to save Him. Instead, He chose to save you.
244
1,583
89
24,972
717,289
A freight line on Manhattan's West Side grew wild for 25 years after its last train. That self-seeded landscape inspired the gardens of the park that replaced it: the High Line. The High Line was built in the 1930s to remove freight trains from Manhattan's streets. It delivered milk, meat, produce and goods into the upper-floor loading docks of factories and warehouses on the West Side. The last train ran in 1980, and the park's own blog says its cargo was frozen turkeys. After that the tracks stood unused, and wild flowers, trees and shrubs seeded themselves along the line, about 30 feet above the street. Parts of the structure had been torn down in the 1960s and in 1991. In 1999 two neighbors, Joshua David and Robert Hammond, founded Friends of the High Line to save it. Mayor Giuliani signed a demolition order as one of his last acts in office, but the line was saved through the federal railbanking program. James Corner Field Operations, Diller Scofidio + Renfro and planting designer Piet Oudolf were chosen to design the park. The first section, from Gansevoort Street to 20th Street, opened in June 2009. The first two sections cost $152.3 million, of which the city paid $112.2 million. The city says the park drew more than two million visitors in its first year. Later sections opened in 2011, 2014 and 2019, and the park now runs 1.45 miles. Oudolf's planting design is inspired by the self-seeded landscape that grew on the tracks. Original railroad tracks crisscross the planting beds, among 150,000 plants in more than fifteen planting zones. The City of New York owns the High Line, and Friends of the High Line raises nearly all of its annual budget. A structure the city once ordered torn down became a park that drew more than two million visitors in its first year. What a site is worth depends on what someone sees in it, and on the High Line the clue was already growing on the tracks.
1
52