
Founder https://xitter.gq/t.co/aFrN4tg8nI | @zodhyaofficial Physical Intelligence that runs Energy Decisions for infrastructure. Interested in tech & energy.
San Francisco, US
Joined February 2014
- Tweets1.3K
- Following301
- Followers223
- Likes2.5K
News around large data centers wasn't great over the past few weeks. One suggestion was to launch data centres in space. In this blog, I explore a few challenges it brings, that might end up requiring scientific breakthroughs. Hope you enjoy reading it!
1
63
A single dashboard does not make a complex facility act as one system.
The real test comes when something goes wrong.
Schneider Electric’s new rail control platform brings energy, station, tunnel and facility operations into a shared environment. What interests me is the operating challenge behind it.
When power is constrained or equipment behaves unexpectedly, each team sees a different part of the problem. The electrical team needs to protect supply. The facilities team needs to maintain safe conditions. Operations needs to keep service running.
Putting those signals on one screen helps. But it does not answer the harder questions: Who acts first? Which equipment can adjust? What must not change? How do teams know the response worked?
My view is that the next step in infrastructure software is not another dashboard. It is a clear way to turn information across existing systems into coordinated, safe decisions, with people still in control.
That applies well beyond rail; to factories, hospitals and large commercial buildings. The systems are already there. The missing piece is often how they work together under pressure.
Where do handoffs between your facility teams cause the most friction?
1
2
39
Source:
se.com/sg/en/about-us/newsro…
14
With the US midterms done and the noise surrounding a clampdown on the data centers, even with the dominant use of AI, it made me wonder what's next.
Hyperscalers have the resources to pursue large power and infrastructure partnerships. Colocation operators serving enterprise customers face a different challenge: how to add reliable capacity while power, cooling and expansion timelines remain constrained.
Getting more usable capacity from the infrastructure they already have matters. But it is not the whole answer.
More of my thoughts on what's stopping them from delivering are in the article below.
2
52
Proud to see @ZodhyaOfficial featured in NITI Aayog’s AI-Preneurs of India.
Sharath and I started with a practical question: can AI help buildings and industries run better using the equipment they already have?
Grateful to our team, customers and AIC IIIT Hyderabad.
1
2
35
Presented Saro Energy in the U.S. through the Polsky Center at UChicago, hosted by G2C Ventures.
Saro uses physical AI to unlock more usable capacity from the power and thermal infrastructure facilities already have.
Grateful for the thoughtful questions and conversations.
1
2
54
The first step toward flexible infrastructure is not control.
It is knowing what is actually connected.
FERC has allowed PJM to establish a registry for large electricity users while rejecting its proposed framework for curtailing data centers during grid emergencies.
PJM expects data-center demand in its region to triple to approximately 29 GW by 2030.
But the most interesting development is the registry itself.
It will record information such as energy providers, service dates, demand ramp-up schedules, backup generation, fuel sources and locations.
Before the grid can determine which loads can safely respond, it needs a reliable picture of what exists and how it behaves.
The same principle applies inside a factory, commercial building or data center.
You cannot safely optimize infrastructure if equipment lists are incomplete, naming is inconsistent, operating limits are unknown or backup assets remain invisible.
I believe physical AI begins with operational truth: an accurate asset map, live equipment behavior, real electrical headroom and clear constraints. Optimization comes afterward.
At Saro, this is why interoperability and equipment-level context matter. The goal is not to issue more commands. It is to know which action is safe.
How complete is your facility’s operational inventory today?
1
29
Source: reuters.com/business/energy/…
33
South Korea did not feel like a market looking for more technology.
It felt like a market looking for technology it can trust in operation.
Representing our tech at FLY ASIA 2026 in Busan gave me the opportunity to speak with investors, enterprise ecosystem leaders and potential partners from across South Korea and Asia.
Three things stood out:
1. Deployment evidence matters. Conversations quickly moved from the vision to integration, measurable results and whether the technology can work with existing infrastructure.
2. Local partnerships are essential. Entering Korea is not simply about selling remotely. Trust, local support and long-term relationships carry real weight.
3. There is a strong opportunity for energy intelligence. Korea’s advanced manufacturing base and dense commercial infrastructure need better ways to improve energy efficiency, equipment reliability and operational resilience.
For Saro Energy, the takeaway is clear: enter with focused pilots, demonstrate compatibility and measurable value, and build alongside local partners.
I am leaving Busan with a much clearer understanding of the market and several promising conversations to continue.
Thank you to the FLY ASIA team for creating a valuable platform for international startups to connect with the Korean ecosystem.
What has been your biggest learning when entering the South Korean market?
2
40
LLMs are good at language.
Buildings run on physics.
A recent review examined 66 studies applying LLMs to HVAC operations. Only four reached pilot-level evidence, and none reported sustained operational deployment.
That does not mean LLMs have no role in buildings.
They can help operators search manuals, organize maintenance history, standardize confusing equipment names and understand alarms faster.
But changing a chiller setpoint or airflow is different.
Real-time control requires local sensing, fast responses, clear operating limits and safe fallback behavior. A confident-sounding answer is not enough when equipment performance, occupant comfort and uptime are involved.
I believe the right architecture separates these responsibilities.
Use LLMs to help people understand and interact with complex systems.
Use bounded, physics-aware intelligence closer to the equipment to make and execute operating decisions.
At Saro, this distinction matters: intelligence should improve operations without turning the building into an experiment.
The future is not one LLM running an entire facility. It is different forms of intelligence doing the jobs they are best suited for.
Where would you trust an LLM today: answering questions, recommending actions or directly changing controls?
2
3
114
Source: arxiv.org/abs/2609.05314
7
Energy software cannot fix a 12× price gap. But it can stop manufacturers from managing it blindly.
As INEOS idles three UK plants, energy data must move from monthly reporting to real-time decisions about what to run, when and at what margin.
Energy is no longer just overhead. It is part of the production plan.
Can your team identify the energy cost of one production batch today?
2
2
34
Rohith retweeted
#NextGenBharat | Young innovators in Hyderabad are developing smart solutions, from AI that understands user needs without lengthy prompts to technologies enabling traffic control through hand gestures and improving energy efficiency.
Watch Full Program: youtu.be/FxBrHd0kyWs
@ANI #AIInnovation #SmartTechnology #YoungInnovators #Hyderabad
The next data-center bottleneck may not be power.
It may be proof.
On September 14, Texas directed its water agency to penalize data centers and other major users that fail mandatory water-use reporting. Of 329 data centers surveyed for 2025, nearly 30% responded.
This is more than a water story. It is a signal that operational data is becoming part of a facility’s permission to operate.
For years, monitoring systems were justified through uptime and efficiency. Now, this kind of evidence can influence permitting, grid interconnection, community trust and deployment timelines.
Portfolio-level estimates will not be enough. Operators will need defensible answers at the facility and asset level:
-Where was the resource consumed?
-Which operating condition caused the change?
-Was the behavior expected, avoidable or unsafe?
-What action followed?
I believe the market is underestimating this shift: observability is becoming a commercial and regulatory asset, not just an engineering tool.
2
26
The biggest intelligence gap in AI infrastructure may not be at hyperscalers.
It may be among NeoCloud and mid-market data-center operators, facing hyperscaler-grade power, cooling and GPU demands without hyperscaler-sized engineering teams.
The problem isn’t a lack of data. BMCs, racks, PDUs, generators, converters, HVAC systems, environmental sensors and workload managers all produce it.
The problem is that these systems rarely explain the facility as one operating system.
That fragmentation creates the gap between rated capacity and usable compute:
• How much more load can be added safely?
• What is constraining it?
• How should the facility respond as electrical, thermal and workload conditions change?
But interoperability is the real test: BMCs, racks, generators, power systems, cooling, grid interfaces, standards, APIs and local protocols.
Physical intelligence is only useful if it works with what is already installed.
Where is the biggest blind spot today?
2
35







