Crisp County, GA wrote the neighbors' concerns into the data center rezoning: 325-ft setback, construction traffic on a different road, evergreen screening, commercial noise limits, set work hours.
Approved unanimously.
Most stalled projects go public before the answers do.
4
KC's new economic scorecard: asking rent up 4.3%, income up 7.6%, but housing permits down 22.5% while construction costs climb 7.6%.
Demand grows, supply doesn't. Existing buildings gain value, and new deals need a sharper pencil.
linkedin.com/feed/update/urn…
31
Alabama Power filed to cut rates $160M in 2027, "driven primarily" by large-load data centers.
Evergy Missouri West's request is $61M smaller than it would have been, from anticipated revenue at two large data centers.
Growth pays for growth when the tariff is written that way.
30
The first-principles prompt I use before anyone pays for a study on a Midwest industrial or data center site:
1. Power path (utility, kV, large-load process)
2. Zoning path (by-right vs special use vs PD)
3. Fiber (who serves it; nearest colo / IX)
4. Water + flood
5. Buildings / land constraints
6. Buyer pool (who actually signs)
7. Label every fact Verified / Inferred / Unknown
8. Never quote a screening tool's MW as fact
Full prompt in the image. What would you add?
1
1
63
Power gets a data center site on the shortlist. Community approval decides whether it gets built.
We pulled a 10-step approval playbook from six public 2025 cases: Lancaster PA, Ankeny IA, Crisp County GA, Dalton GA, Port Washington WI and the Kansas large-load tariff.
1
52
Friday at the Energy & Data Center Innovation Summit at Sporting Park.
The agenda was power, grid connection, and local approvals. That's the KC market in one sentence.
Speed to power is only half the story. Permission is the other half.
I write about both in Speed to Power.
1
61
In St. Louis last week walking data center infrastructure, not just reading it off a spreadsheet.
A hall tells you how the power, cooling, and connectivity actually work. Drawings help. The walk decides.
What do you look at first when you tour one?
47
KCMO's new economic scorecard: population +1.0%, median household income +7.6%, asking rent +4.3%.
But housing permits are down 22.5% and commercial construction costs are up 7.6%.
Demand is growing. Supply isn't. That gap favors owners of existing buildings.
32
A $28M Leawood, KS project that isn't really about storage.
The Foundry: luxury garage condos with a clubhouse bar, poker nights and weekly Cars + Coffee. Units from $315K.
Builds like this pop up where people want to be. Would you buy in?
linkedin.com/feed/update/urn…
23
TPG Net Lease's Gordon Whiting: "I'd rather be investing in a rising interest rate environment." A higher going-in cap rate on a 20 to 25 year lease leaves more room for compression.
CBRE's Spencer Levy says he's the first guest in 7 years to say it. Owner-users thinking about a sale-leaseback should hear this.
Clip: The Weekly Take from CBRE, Oct 26, 2026
1
71
Grid maps see the highways. Your building lives on the streets.
How power gets to a data center, in road terms:
1. Generation = the factory that makes the cars. Power plants: gas, coal, nuclear, wind, solar.
2. Transmission = the highways. Tall towers, very high voltage (115/161/345 kV+), long distances. Big transmission substations are the interchanges where voltage steps down.
3. Distribution = the streets and driveway. Smaller lines, usually 12 to 35 kV, from a local substation to the transformer at your building. This is where it really gets decided.
ISOs (SPP, MISO, PJM) are the traffic controllers. They don't own the lines. They run the grid across states and approve new plants and big loads. Kansas + western Missouri = SPP. Iowa + eastern Missouri = MISO.
Utilities like Evergy, MidAmerican and Ameren usually own all three pieces here. A data center signs with the utility. Rural co-ops mostly own the rural streets.
Most online tools only see the highways. They can't see the streets or the line of big users already waiting for power.
Transmission tells you power is nearby. Distribution and a will-serve letter tell you if your building can get it.
That's what I help owners and data center buyers figure out at Midwest CRE Advisors: which buildings can actually get power.
53
In Silicon Valley, industrial sites with ~4,000+ amps are leasing at 49% higher rents than standard industrial (JLL via Commercial Observer).
Electrified outdoor storage is a real category now. If you own a KC truck yard, find out what power you have before you price it.
1
46