Photo by Logan Freeman (@LiveFreemanBlog)Photo by Logan Freeman (@LiveFreemanBlog)Photo by Logan Freeman (@LiveFreemanBlog)Photo by Logan Freeman (@LiveFreemanBlog)Photo by Logan Freeman (@LiveFreemanBlog)Photo by Logan Freeman (@LiveFreemanBlog)Photo by Logan Freeman (@LiveFreemanBlog)Photo by Logan Freeman (@LiveFreemanBlog)Photo by Logan Freeman (@LiveFreemanBlog)Photo by Logan Freeman (@LiveFreemanBlog)
Crisp County, GA wrote the neighbors' concerns into the data center rezoning: 325-ft setback, construction traffic on a different road, evergreen screening, commercial noise limits, set work hours. Approved unanimously. Most stalled projects go public before the answers do.
4
Replying to @anasalhajji
The Statnett numbers are the story: 9,100 MW already in the queue and 18,000 MW more requested, against a national peak just over 25,000 MW. When the queue rivals the grid, the utility either writes large-load rules or stops the line.
4
Replying to @KobeissiLetter
For data center landlords this is the number to watch. A long lease is only as good as the tenant's credit behind it. When default protection gets this expensive, underwriting moves from the press release to the balance sheet.
4
KC didn't say no to data centers. It said no to a 20-story tower downtown. Google leased a 920,400 SF building on I-49 for a hyperscale data center. The demand here is going into existing industrial with power, not skyscrapers.
JUST IN: Kansas City rejects developers' proposal to build a 20-story “vertical data center” skyscraper downtown, following local opposition.
32
Replying to @dolphinR123
Power is necessary, not sufficient. The landlord wants a credit tenant, the utility wants a signed load commitment, the operator needs the GPUs funded. A site only fills when all three line up, and that's the gap between having power and leasing it.
1
44
Lower Treasury yields this week won't refinance a 2027 maturity. BEA: core PCE 3.3% y/y in October, Q3 GDP revised up to 4.3%. Kansas City owners with debt coming due should get a real lender quote now, not underwrite the rally.
THE US ECONOMY JUST GREW 4.3%. INFLATION HAS CLIMBED TO 3.8%. THE NASDAQ PLUNGED AS MUCH AS 4.6% YESTERDAY. YET US TREASURY YIELDS HAVE FALLEN TO MULTI-WEEK LOWS. WHY ARE INVESTORS BUYING GOVERNMENT BONDS WHEN THE ECONOMY IS GROWING THIS FAST? Because I think we're witnessing something that a lot of traders are completely overlooking. Yesterday, the US released two incredibly important economic figures. Third-quarter GDP growth was revised UP to 4.3% annualised. The fastest growth in three years. Meanwhile, the Fed's preferred inflation measure climbed to 3.8%, with core inflation reaching 3.3%. On paper, you've got a strong economy. But there's a problem. THE ECONOMY MIGHT ACTUALLY BE TOO STRONG FOR ITS OWN GOOD. Let me explain my thinking. When economic growth remains strong and inflation refuses to come down, the Federal Reserve has less reason to ease monetary policy. In fact, markets are now expecting another interest rate hike in December. And higher borrowing costs are NOT exactly what investors in highly valued technology companies want to see. Look at what happened yesterday. The Nasdaq was down as much as 4.6% during the session. Technology stocks were getting absolutely hammered. Yet the Nasdaq managed to recover most of those losses before the closing bell. Now, ordinarily, with economic growth that strong and inflation still elevated, you'd expect upward pressure on Treasury yields. BUT YIELDS WERE FALLING. Why? Because investors were buying government bonds as equities came under heavy pressure. Remember, when demand for bonds increases, their prices rise. And yields FALL. So we've got an extraordinary situation. The economy is growing rapidly. Inflation is accelerating. The Federal Reserve is expected to tighten monetary policy. Yet bond investors are increasingly concerned about the risks developing across financial markets. Now look at GOLD. Gold has been absolutely hammered this month. And people keep asking why the supposed inflation hedge isn't performing better when inflation is getting worse. I've been explaining this relationship for months. Gold doesn't simply respond to inflation. It responds to REAL interest rates. The US dollar. Liquidity conditions. And expectations surrounding monetary policy. And when investors are facing significant losses elsewhere, even gold can get sold to raise cash. That's why I'm paying such close attention to what's happening in the bond market. THE FED IS FIGHTING INFLATION. INVESTORS ARE WORRIED ABOUT FINANCIAL CONDITIONS. Those two forces are pulling markets in different directions. And the market could remain incredibly volatile until one begins to dominate. Wall Street is closed today for Thanksgiving. But when trading resumes, I'll be watching whether buyers can defend yesterday's extraordinary Nasdaq recovery. Whether bond yields continue falling. And whether gold starts responding to any sustained decline in REAL yields and the dollar. Because a falling nominal Treasury yield doesn't automatically mean the pressure on gold has disappeared. After nearly two decades trading these markets, one thing I've learnt is that the biggest changes often begin when different asset classes start telling different stories. And right now, the bond market and the stock market are giving us plenty to think about. TRADERS, I'M CURIOUS... IF THE US ECONOMY IS GROWING AT 4.3%, WHY ARE INVESTORS STILL LOOKING FOR SAFETY IN GOVERNMENT BONDS? Is this simply a temporary flight to safety? Or is the bond market beginning to price in the DAMAGE that prolonged high interest rates could eventually cause?
36
KC's new economic scorecard: asking rent up 4.3%, income up 7.6%, but housing permits down 22.5% while construction costs climb 7.6%. Demand grows, supply doesn't. Existing buildings gain value, and new deals need a sharper pencil. linkedin.com/feed/update/urn…
31
Alabama Power filed to cut rates $160M in 2027, "driven primarily" by large-load data centers. Evergy Missouri West's request is $61M smaller than it would have been, from anticipated revenue at two large data centers. Growth pays for growth when the tariff is written that way.
30
Replying to @UtilityDive
A 3 GW pipeline against a 439 MW peak is the story for a lot of smaller utilities right now. Demand isn't the constraint, generation and transmission are. Across the Midwest the sites that win are the ones with power already energized, not just a spot in the queue.
10
If AI servers can't ship to Southeast Asia, that compute has to land somewhere. Nvidia reportedly paused server shipments to 4 countries after a Nov 16 Commerce export rule. US sites with power already energized just moved up the list.
JUST IN: Nvidia tells manufacturing partners to halt shipments of servers with its chips to Malaysia, Singapore, Thailand and Indonesia.
24
Replying to @BobKnakal
Four decades in and still sharing what you know every week. That's the lesson I took back to Kansas City: publish the data on a schedule, show your work, and the right owners find you. Thankful for the mentors who open their playbook. Happy Thanksgiving, Bob.
10
In Johnson County, a big building plus a tax break now reads as "data center." Olathe's 175th & 169 project: about 1M SF on 70 acres, up to $80.5M in industrial revenue bonds. City says warehouse, no data center plans. The real tell is a utility load request, not square footage.
KSHB 41 Finds Olathe Site Is Warehouse Project, Not Data Center @kshb41 has found no current plan for a data center at an Olathe site near 175th Street and U.S. 169, despite community discussion about a proposed $80 billion computing facility receiving tax breaks (source). The documents point elsewhere. Olathe city records describe a roughly 1,006,880-square-foot industrial warehouse and distribution facility planned for about 70 acres. Tax abatement has been approved, and the paperwork includes an estimated $80 billion development figure, but the project’s documented use is industrial warehousing rather than data processing. That distinction matters to residents, utility planners and businesses. A million-square-foot warehouse can produce substantial truck traffic, construction activity and infrastructure demand. A comparably large data-center development brings a different set of questions, particularly around electricity procurement, transmission capacity, backup generation, cooling and water use. The data-center rumor was not implausible on geography alone. The broader Kansas City market already includes @Microsoft and @Google data-center operations. @digitalrealty and Beale Infrastructure are also pursuing major campuses in nearby De Soto. As artificial intelligence infrastructure expands, industrial parcels with suitable zoning, fiber access and room for utility connections can attract attention long before a tenant or final use becomes clear. Still, a tax incentive and a large building footprint do not establish that servers are coming. Public records such as site plans, development agreements, zoning applications and utility filings provide stronger evidence than speculation. In this case, the available Olathe documents support a warehouse and distribution use. insight.tmcnet.com/insight/k…
58
A hyperscaler just signed an 18-year, 150 MW lease. The same week, the Senate voted 62-33 to make new 20 MW+ data centers pay the full cost of their grid upgrades. Existing power just got more valuable. I walked through this on PLOT Live.
1
58
Residents' first data center question: "Will my power bill go up?" In Kansas, the regulator answered. Evergy's large-load plan (75 MW+): 80% minimum bills, 2 years of collateral, exit fees, and customer-only upgrades billed to that customer. A commission order beats a promise.
21
Demand isn't the bottleneck. Approvals are. Goldman: about 52 GW of new US data center capacity could come online in 2028 alone, and it flags more scrutiny after the midterms. Sites with power, plant and fiber already in place get built first.
Goldman Sachs estimates about 52 GW of new data-center capacity could be added to the U.S. grid in 2028 alone, and forecasts the buildup will drive natural gas demand over the next two years, Reuters reported. #NaturalGas #DataCenters #Goldman oilprice.com/Latest-Energy-N…
26
Replying to @BobKnakal
That limbo is policy risk showing up in the capital stack. Kansas and Missouri both bar local rent control by statute, so a Kansas City lender can underwrite the rent roll and take a building back without inheriting a regulatory trap. Recovery value is the whole game.
1
45
Replying to @moseskagan
Same honesty works when owners ask about selling. In Kansas City I tell them up front: you know your building better than any buyer ever will. My job is knowing the buyers, the comps, and what the power and zoning on the site are worth today.
1
151
Everyone's talking about banks dumping data center loans. The CMBS data says otherwise. Trepp, October: cash traps on 4.6% of CMBS balance, office at 7.0%. Data centers: none. Lenders are pricing construction and power risk, not the asset class.
CMBS cash traps now cover $31.2B of outstanding loans, or 4.6% of the market. Office leads at 7.0%, with $13.2B trapped. And trapped loans are more than twice as likely to reach special servicing within two years. Read more 👉 credaily.com/briefs/cash-tra…
37