I wrote this to counter the potential for inconsequential cancellation of HBM orders. Obvs I used AI to structure it, but the arguments are mine and I’m lazy.
Long-term HBM take-or-pay contracts are fundamentally different from traditional commodity DRAM purchasing arrangements. Several factors make default commercially and strategically unattractive.
1. Only three manufacturers: SK Hynix, Samsung and Micron are the only companies producing HBM in significant commercial quantities. A customer cannot easily find an alternative supplier.
2. Loss of future allocation: If XYZCo defaults on its contract, its supplier may reallocate production capacity to other customers. When XYZCo subsequently needs HBM, it risks finding itself at the bottom of a long waiting list, behind customers that honoured their commitments.
3. Strengthening competitors: Capacity surrendered by XYZCo could be allocated to Nvidia, AMD, Google, Amazon or another competitor. XYZCo would potentially be financing its competitors’ growth by surrendering access to a scarce strategic resource.
4. Contractual penalties: Under a genuine, enforceable take-or-pay agreement, XYZCo may remain liable for contracted purchases even if it no longer requires the memory. Default could therefore create substantial financial liabilities without eliminating the underlying cost.
5. Increasing product customisation: From HBM4 onwards, customer-specific logic base dies, packaging and integration make memory progressively less interchangeable. Abandoning a supply agreement could mean losing years of joint development, qualification and engineering investment.
6. An expanding technological moat: Each HBM generation requires increasingly sophisticated fabrication, stacking, packaging, thermal management and integration technologies. China’s inability to purchase EUV lithography equipment, together with other technological restrictions, makes the emergence of additional leading-edge suppliers particularly difficult.
7. Increasingly proprietary architectures: Future technologies such as zHBM and 3D DRAM could integrate memory much more closely with compute, incorporating customer-specific intellectual property. This would increase switching costs and deepen long-term supplier relationships, although these technologies remain under development.
8. Expanding underlying demand: AI training, inference, agentic AI, hyperscalers, neoclouds and sovereign AI infrastructure all compete for computing capacity. Customers may therefore prefer to retain HBM allocations through temporary demand slowdowns rather than risk being unable to expand subsequently.
9. No established HBM commodity cycle: Unlike conventional DRAM, AI-driven HBM demand has not yet experienced a complete boom-and-bust cycle. There is consequently no demonstrated historical basis for assuming that HBM prices and profitability must follow traditional DRAM cycles.
Conclusion
For XYZCo, the cost of defaulting could greatly exceed the cost of honouring its contract.
Default could expose XYZCo to contractual liabilities, destroy its credibility, jeopardise future access to one of the world’s most strategically important semiconductor technologies and hand scarce production capacity to competitors.
The combination of concentrated supply, increasing customisation, formidable barriers to entry and expanding AI demand gives customers powerful incentives to maintain their contractual commitments.
The greatest deterrent may not be the financial penalty for default. It is the prospect of being unable to obtain HBM when the customer needs it again.
This argument is strongest while HBM capacity remains scarce. It does not make defaults impossible, particularly if a customer becomes insolvent or industry-wide oversupply develops. But it provides a compelling reason why long-term HBM contracts could prove considerably more resilient than conventional memory purchasing agreements.
transLog1c retweeted
Some industry commentary regarding a few claims recently on memory + Softbank Turbine defaulting.
- On claims that LTAs are "meaningless while prices fall":
$MU: "strategic customer agreements cannot be unilaterally canceled. Customers are obligated to pay for their committed volumes whether they take delivery or not"
"These are take or pay agreements and there are no contractual outs for our customers from these agreements"
Regarding historical contracts breaking: "These LTAs that we used to have never had any binding terms." The new SCAs contain extensive contractual obligations
Regarding Elon's claims on Softbank defaulting on Turbines:
Question from Morgan Stanley to $GE Vernova CEO on whether they see cancellations or financing difficulties with counterparties on their turbine orders:
“No… we are not”
TLDR:
- Micron states LTAs/SCAs are noncancellable take/pay (where counterparties are hyperscalers). And that these types are different from historical memory cancellations.
- On Softbank turbine orders, GE Vernova CEO Scott Strazik said it wasn't seeing customer financing disruptions, requests to exit turbine reservations, or slowdowns.
Maybe Elon's claims are more narrow, but should be evaluated more closely given competitive interests vs. Softbank/OpenAI.
transLog1c retweeted
Heard Dario said “Thank you” sincerely three times during the Fidelity roadshow to the buy side investors.
The IPO was saved although with a low ball offer.
RT @JonahLupton: Every week there’s a new FUD narrative for the memory companies and the neoclouds.
Over the weekend a couple accounts cl…
This quoted post is unavailable.
A few interesting takeaways from Zhongji Innolight (300308.SZ) mgmt latest earnings call (Oct 29th):
- 2027 demand visibility remains exceptionally strong. Firm POs from major customers already cover the full year, with no signs of order cuts. Early 2028 guidance from some key customers points to further growth.
- NPO and other next-gen optical interconnects are expected to start ramping in 2H27, with large-scale deployment anticipated in 2028.
- Most of the company's future capacity expansion is expected to take place in Thailand and other SEA countries.
- DSP supply remains tight, but mgmt is confident in securing sufficient supply to meet customer demand and believes concerns over the potential $MRVL $LITE deal are overblown.
- Mgmt cited industry research projecting 70%+ CAGR for the scale-across market over the next few years, driven partly by power constraints that are pushing AI clusters toward greater interconnectivity.
Overall, mgmt remains very confident in both the industry outlook and the company's competitive position heading into 2027–2028.
transLog1c retweeted
I am shocked, absolutely shocked, that Anthropic ARR has likely gone vertical in October after they cut token prices.
Except the exact same thing happened for the entire AI market, which is why GPU rental prices have surged while token prices declined.
$100b plus in year-end ARR looks possible again.
transLog1c retweeted
Volatility on misunderstood newsflow seems endemic to AI:
Deepseek.
Liberation Day.
Kimi.
SALP.
Gross to net confusion for Anthropic.
OpenAI taking share from Anthropic.
Gross to net confusion for OpenAI.
A mistranslation of Hock Tan’s comments yesterday.
transLog1c retweeted
transLog1c retweeted
The next frontier for AI connectivity is connecting AI clusters across data centers up to 1,000 km apart.
At Investor Day, Russ Esmacher, SVP and GM, Data Center Interconnect, explained why scale-across is a step change for DCI: ~15x the bandwidth of traditional DCI, and a pull toward 1.6T and 3.2T coherent pluggables. Marvell led the shift to coherent pluggables a decade ago and has shipped more than a million. Now it's bringing 2nm-powered 1.6T modules to market and investing in 3.2T.
Watch the full presentation: mrvl.co/3TzCLBM
transLog1c retweeted
Most if not all data center interconnect technologies are going to have some degree of adoption and success in the near future, and every one of them either already has customers, is being developed with them, or has products to back it. Copper (never count the old man out) is the backplane in every NVL72 rack and AECs are a billion-dollar product line. Pluggable transceivers are ramping 1.6T on top of record 800G volume. Nvidia has scale-out CPO switches in manufacturing. OIF approved a 12.8T NPO project in May with 40+ vendors and Huawei as the main advocate and backer. Broadcom showed a 3.2T VCSEL-based NPO line earlier this year at OFC. Credo bought Hyperlume while Marvell is building microLED links with Mojo Vision. SiPh is already inside most 800G and 1.6T DR modules, TSMC has a 200G microring modulator in production on COUPE, and HyperLight is running TFLN on 8-inch wafers at UMC (TFLN could take more time to mature). Broadcom's CPO switches come with ELSFP lasers, and Tower and NewPhotonics just announced volume shipments of engines with the laser integrated (ILS). Google runs OCS in both its TPU scale-up pods and its scale-out fabric, and Lumentum and Coherent are shipping OCS systems. Rumors around Nvidia also considering OCS, but nothing beyond rumors for now. Coherent lite already has a 1.6T Oband DSP from Marvell for campus links.
TL;DR: exciting times to be right in the center of this interconnect storm.
Column|Nobody Is Actually Pausing AI. We Asked the Labs
Market reaction looks overdone: Dario Amodei’s September 12 call to slow frontier AI development, backed by Sam Altman and Elon Musk, triggered a selloff in AI hardware stocks. Our interviews with three frontier-lab experts suggest the selloff was too pessimistic, as labs are not actually halting model training or infrastructure buildout.
Safety concerns are real, but incentives matter: Frontier labs are increasingly focused on risks as capabilities advance, including concerns around autonomous behavior and weaker chain-of-thought monitoring. At the same time, stricter oversight could favor leading labs such as Anthropic and OpenAI by raising compliance costs for smaller players and giving incumbents more time to monetize current models.
Coordination remains difficult: Past safety commitments in Jul 2023, Sep 2023, Oct 2025, and Jul 2026 all failed to produce a lasting industry-wide pause. We expect any near-term slowdown effort to rely mainly on voluntary company commitments and industry coordination, with limited enforcement and weak government backing.
Compute demand should stay resilient: Lab interviews indicate training will continue, while safety, post-training, alignment, and evaluation may absorb a larger share of compute budgets. Our Tokenomics enterprise panel (N=41) shows less than 5% of sampled companies’ AI spending goes to the most advanced frontier models, suggesting delayed frontier releases should have limited impact on near-term enterprise inference demand.
Detailed Report
fundaai.substack.com/p/colum…
President Trump calls Jensen mid-interview at the All-In Summit to say AI taking over the world is a hoax
Jensen: "Mr. President? I've got to tell you something. If it wasn't because of you calling, I would... I'm on stage with the besties."
Trump: "You see, the great thing about life is that Jensen can develop the most complex computer chip in the world that nobody can copy for 10 years, but he can't figure out how to put me on speaker."
"So, the AI, it's almost a conspiracy, and the happiest group is China, they're very happy."
"I'm telling you, it's all a hoax. The data centers are great and they make people wealthy and they make states wealthy and it's the oil of the next 20, 25 years. It's bigger than the Internet."
"The robots are not going to be taking over the world and that's not going to happen. The AI will not be taking over the rest of the world. The whole thing is a hoax."
"Now, with that, we have to be a little bit careful, but that doesn't mean we're going to stop an industry. So I'm with you all the way."
transLog1c retweeted
Replying to @PhotonCap
Yes. Importantly, CRDO’s current FY28 target of $1B+ in quarterly revenue does not include any potential revenue contribution from its memory expansion products.
That could represent a very meaningful source of upside that is still largely underappreciated by the market.
In fact, one could arguably say that CRDO is currently one of the companies closest to bringing MicroLED-based connectivity into large-scale commercial deployment.
transLog1c retweeted
Credo $CRDO CEO at the Goldman Sachs Communicopia on their optical transceiver margins, CEO Bill Brennan said ZeroFlap’s (their transceiver family name) reliability features should support higher selling prices. Credo also designs its own DSPs and silicon photonics PICs, which gives it more control over costs. It may bring more components in-house which might be a hint at potential future acquisitions.
transLog1c retweeted
Elon built a power plant in Mississippi to run computers in Tennessee. They're a few hundred feet apart. The state line between them is doing all the work.
Here's the trick. Air permits come from state regulators. Memphis fought his turbines for a year. So he put the new ones just over the line in Southaven, where Mississippi approved all 41 of them three weeks after the public hearing. Unanimous vote.
The computers stayed in Memphis, because Tennessee has some of the cheapest power in America.
Then Mississippi handed him the biggest deal in state history to get the next building. $20 billion, and he pays zero sales tax on the chips inside it.
Add it up. Turbines where the permits come easy. Servers where the power comes cheap. GPUs where the tax is zero. Every piece of the project sits in whichever state charges less for it.
Neither state got the whole thing. Both gave him their best offer anyway.
The power plant makes half as much electricity as Hoover Dam. And the extension cord crosses a state line.