Rishab Mehta (Jain) (@rishabmehta7) header
Rishab Mehta (Jain) (@rishabmehta7) profile picture
Bangalore
Joined January 2010
Photo by Rishab Mehta (Jain) (@rishabmehta7)Photo by Rishab Mehta (Jain) (@rishabmehta7)Photo by Rishab Mehta (Jain) (@rishabmehta7)Photo by Rishab Mehta (Jain) (@rishabmehta7)Photo by Rishab Mehta (Jain) (@rishabmehta7)Photo by Rishab Mehta (Jain) (@rishabmehta7)Photo by Rishab Mehta (Jain) (@rishabmehta7)Photo by Rishab Mehta (Jain) (@rishabmehta7)Photo by Rishab Mehta (Jain) (@rishabmehta7)Photo by Rishab Mehta (Jain) (@rishabmehta7)
Rishab Mehta (Jain) retweeted
🚨🗞️ BMRCL is planting the seed for another unfair 5% hike in Feb'27 to cover it's inefficiency. Bengaluru: Remember that you pay the country's highest fares due to blatant formula misapplication Do not get distracted in the Centre v/s State cat fight. Say loudly #NoFareHike
6
45
1
195
6,142
Rishab Mehta (Jain) retweeted
Replying to @blrmetrotracker
Iblur Station latest visuals #NammaMetro #blueline
6
8
123
3,543
Bengaluru's next most important line after Inner Ring in phase 4 has to be this. Banashankari VI - Chamarajapete - Sree Kanteerava - Richmond Town - Dommaluru - HAL - Marathahalli - Varthuru - Whitefield. UG section from HAL to 80ft road before joining NICE link.
Replying to @Kuma50531Kumar
Hope to see a #NammaMetro line on NICE link road in South #Bengaluru from Deepanjali Nagar covering BEML Layout, residential areas around Uttarahalli road, BSK 6th stage #BrandBengaluru
16
13
225
12,677
Rishab Mehta (Jain) retweeted
Challaghatta Depot construction update #PurpleLine #NammaMetro
1
56
2,022
Rishab Mehta (Jain) retweeted
🔵 Airport Metro Package 3 Update: Deck slab being tied at AP1105-AP1106 RHS Steel U Girder near Airport. Once this slab is cast and the missing span next to it is launched, this section of viaduct will be handed over to track team for track work. Track work is currently ongoing nearby, towards Airport Terminal Station. #BMRCL #NammaMetro
10
20
1
327
18,706
Rishab Mehta (Jain) retweeted
For the First Time Ever, Kempegowda International Airport, Bengaluru, is having Simultaneous Departures! 🇮🇳😍 KIAL becomes the 2nd Indian Airport after Delhi to have Simultaneous Departures from its Parallel Runways!
5
11
3
264
7,967
Rishab Mehta (Jain) retweeted
🚇 Bengaluru Metro 🩷 Pink Line: BMRCL seeks nod from CMRS to remove buffer barrier at the end of the elevated section to start UG trial runs. 🔵 Blue Line: BMRCL plans to extend trial runs up to HSR Layout. 🟢 Green Line: 10 Titagarh DTG trains received so far; three have been inducted into the fleet. 🟠 Orange Line (Phase 3): Awaiting JICA's nod to float fresh tenders. moneycontrol.com/news/india/…
56
108
14
1,043
62,800
Rishab Mehta (Jain) retweeted
🔵 Devarabeesanahalli Station
11
31
6
936
41,233
Rishab Mehta (Jain) retweeted
Metro around iconic ORR, India's Largest office corrdior Taken from Bagmane WTC- 5mn Campus facing Gopalan fortune city- another 5mn campus
Blue line metro trial run, Bagmane Tech park Mahadevapura !! @ChristinMP_
11
236
11,094
💙💙
Blue line metro trial run, Bagmane Tech park Mahadevapura !! @ChristinMP_
3
99
2,849
Rishab Mehta (Jain) retweeted
Bangalore Blue line metro is under test! Woohoo! Idk when (which year) it's gonna get a green signal but, anyways. Woohoo 🎉 #Bengaluru #bangaloremetro #nammabengaluru – at Bengaluru, India
8
8
1
229
9,285
Rishab Mehta (Jain) retweeted
🚇 💙
Blue line metro trial run, Bagmane Tech park Mahadevapura !! @ChristinMP_
17
30
3
769
20,672
Rishab Mehta (Jain) retweeted
🟣 Challaghatta Depot Works #BMRCL #NammaMetro
3
13
1
283
14,697
Rishab Mehta (Jain) retweeted
early days yet 30k+ daily on a mere 7.5km line imagine the footfalls when it's full fledged and 3-4min frequency mass public transport in cities like BLR is very much the ideal way to move ppl fast and in large volumes
The newly opened elevated section of Bengaluru Metro's Pink Line recorded 33,046 boardings on Nov 16 as of 9pm. Jayadeva interchange station recorded the highest boarding at 21,254, followed by Kalena Agrahara (3,204), Hulimavu (2,439), SG Palya (2,465), Bilekahalli-IIMB (2,239) & NS Palya-JP Nagar 4th Phase (1,445). @OfficialBMRCL
5
1
32
646
Rishab Mehta (Jain) retweeted
BMRCL MD PC Jaffer @pcjaffer speaks about PinkLine UG section, BlueLine & OrangeLine. He said, PinkLine UG is in an advanced stage of work & is expected to be completed within the next 5 to 6 months. #NammaMetro #Bengaluru youtu.be/3s_LwSai8hY
9
17
5
134
25,847
Rishab Mehta (Jain) retweeted
Rank the following as yr ratings for what U think Bengaluru needs most NOW Order in which they are presented in this post, is random Images in ATTACHED post Please click as per your rankings: 1st,2nd,3rd&4th Please do re-post so that more people may share their rankings too.
Tunnel RoadsElevated Roads / FlyoversSarjapura-Hebbal RedMetroMajestic-Airport BSRP C1
2%Tunnel Roads
7%Elevated Roads / Flyovers
58%Sarjapura-Hebbal RedMetro
32%Majestic-Airport BSRP C1
201 votes • Final results
10
30
3
40
2,160
Rishab Mehta (Jain) retweeted
The newly opened elevated section of Bengaluru Metro's Pink Line recorded 33,046 boardings on Nov 16 as of 9pm. Jayadeva interchange station recorded the highest boarding at 21,254, followed by Kalena Agrahara (3,204), Hulimavu (2,439), SG Palya (2,465), Bilekahalli-IIMB (2,239) & NS Palya-JP Nagar 4th Phase (1,445). @OfficialBMRCL
🩷 🚇 Bengaluru turns pink: A ride on Namma Metro’s new line connecting IIM-B @OfficialBMRCL moneycontrol.com/news/india/…
16
20
8
235
29,660
BMRCL & BMTC Strengthen First & Last-Mile Connectivity with Introduction of Metro Feeder Bus Services on Pink Line / ಗುಲಾಬಿ ಮಾರ್ಗದಲ್ಲಿ ಮೆಟ್ರೋ ಫೀಡರ್ ಬಸ್ ಸೇವೆಗಳ ಆರಂಭ: ಮೊದಲ ಮತ್ತು ಕೊನೆಯ ಹಂತದ ಸಾರಿಗೆ ಸಂಪರ್ಕ ಬಲಪಡಿಸಲು ಬಿಎಂಆರ್‌ಸಿಎಲ್ ಮತ್ತು ಬಿಎಂಟಿಸಿ ಸಹಯೋಗ.
17
18
2
112
10,437